NITC Master Plumber · Get comfortable with the vocabulary.
- Fixture unit (FU)
- Related: Drainage fixture unit, Hunter's curve
A dimensionless measure of the probable load a plumbing fixture places on the drainage or supply system, based on its flow rate and use frequency. Fixture units let designers size pipes by combining dissimilar fixtures into one comparable demand figure.
- Drainage fixture unit (DFU)
- Related: Fixture unit (FU), Building drain
The fixture-unit rating assigned to a fixture for sizing sanitary drainage piping, reflecting its discharge volume and drain size. A water closet typically rates higher than a lavatory, so DFU totals drive branch and building drain sizing.
- Hunter's curve
- Related: Fixture unit (FU), Peak demand
A probability-based method that converts total fixture units into estimated peak demand in gallons per minute, accounting for the statistical likelihood that not all fixtures run simultaneously. It underpins demand tables used to size water distribution piping.
- Peak demand
- Related: Hunter's curve, Pressure-reducing valve (PRV)
The maximum expected rate of water flow a system must deliver during its busiest period, usually expressed in gallons per minute. Supply mains, meters, and pressure-boost equipment are sized against this value rather than average use.
- Building drain
- Related: Building sewer, Drainage fixture unit (DFU)
The lowest horizontal pipe inside a building that receives soil and waste from branch drains and conveys it to the building sewer. It ends at the building wall or foundation line, where the building sewer begins.
- Building sewer
- Related: Building drain, Sanitary sewer
The pipe carrying sewage from the building drain's termination point to the public sewer or private disposal system. It lies outside the building footprint and is typically governed by both plumbing and municipal requirements.
- Soil stack
- Related: Vent stack, Trap seal
A vertical drainage pipe that receives discharge from water closets and carries it downward to the building drain. It must extend through the roof or connect to a venting arrangement to prevent trap siphonage.
- Vent stack
- Related: Soil stack, Trap seal, Air admittance valve (AAV)
A vertical vent pipe that provides air to one or more drainage stacks, protecting trap seals from pressure fluctuations. It extends above the roof and may serve as a common vent for several fixtures.
- Trap seal
- Related: Vent stack, Air admittance valve (AAV)
The depth of water retained in a fixture trap that blocks sewer gas from entering the building. Codes set a minimum depth, commonly two to four inches, and require protection from siphonage and evaporation.
- Air admittance valve (AAV)
- Related: Vent stack, Trap seal
A one-way mechanical valve that admits air into drainage piping when negative pressure develops and seals shut afterward, venting a fixture without a roof penetration. Codes restrict its use and require access for maintenance.
- Wet vent
- Related: Vent stack, Trap seal
A vent pipe that also serves as a drain for fixtures on a floor above the fixtures it vents. Its use is limited by code because simultaneous drainage and venting can compromise trap seal protection.
- Cleanout
- Related: Building drain, Drain slope
An accessible fitting with a removable plug or cover that allows a drain snake or jetting tool to clear blockages in drainage piping. Codes specify locations, spacing, and required accessibility for maintenance.
- Drain slope
- Related: Cleanout, Building drain
The downward pitch of horizontal drainage pipe, expressed in inches of fall per foot of run, that lets gravity move waste and solids toward the sewer. Too little slope causes clogging; too much separates liquids from solids.
- Storm drainage system
- Related: Roof drain, Sanitary sewer
The network of roof drains, leaders, area drains, and storm sewers that collects and conveys rainwater and surface runoff away from a building. It must remain separate from sanitary drainage in most jurisdictions.
- Roof drain
- Related: Storm drainage system, Primary and secondary roof drainage
A fitting installed at a low point of a roof to collect rainwater and direct it into a leader or downspout. Its size and strainer capacity are matched to the roof area and local rainfall intensity.
- Primary and secondary roof drainage
- Related: Roof drain, Storm drainage system
A two-tier roof drainage design in which the primary system handles normal rainfall and a secondary system, such as scuppers or overflow drains, handles flows exceeding the primary system's capacity to prevent roof collapse.
- Grease interceptor
- Related: Sanitary sewer, Cleanout
A tank or vault that slows wastewater so fats, oils, and grease float to the surface and solids settle, preventing grease from clogging sewers. Codes set sizing rules and require periodic pumping and inspection.
- Sanitary sewer
- Related: Storm drainage system, Building sewer
A public or private pipe that carries sewage and liquid waste from buildings to a treatment facility. It is kept separate from storm drainage to avoid overwhelming treatment plants during rain events.
- Backflow
- Related: Cross-connection, Reduced pressure zone (RPZ) assembly, Air gap
The unwanted reversal of water flow in a piping system, which can draw contaminants into the potable supply. It occurs through backpressure, where downstream pressure exceeds supply pressure, or backsiphonage, where supply pressure drops.
- Cross-connection
- Related: Backflow, Air gap, Vacuum breaker
Any actual or potential link between the potable water supply and a source of contamination or pollution. Eliminating or protecting cross-connections is the central purpose of backflow prevention programs.
- Air gap
- Related: Cross-connection, Backflow, Flood-level rim
A physical separation between a water supply outlet and the flood-level rim of a fixture or receptacle, providing the highest level of backflow protection. Codes specify a minimum gap, often twice the effective opening diameter.
- Reduced pressure zone (RPZ) assembly
- Related: Backflow, Double check valve assembly, Cross-connection
A testable backflow preventer with two independently acting check valves and a relief valve between them that discharges if either check fails. It protects against both backpressure and backsiphonage in high-hazard applications.
- Double check valve assembly
- Related: Reduced pressure zone (RPZ) assembly, Backflow
A testable backflow preventer consisting of two check valves in series, used for low-hazard protection where only pollution, not contamination, is possible. It cannot discharge relief flow like an RPZ assembly.
- Vacuum breaker
- Related: Backflow, Cross-connection
A device that admits air into piping when pressure drops below atmospheric, breaking a siphon before backflow can occur. Hose-bib and flushometer versions are common low-cost fixture-level protections.
- Flood-level rim
- Related: Air gap, Water closet
The top edge of a fixture or receptacle over which water would overflow onto the floor. It establishes the reference point for air gaps and for setting fixture outlets and backflow devices.
- Water closet
- Related: Flood-level rim, Flushometer
A toilet fixture that receives human waste and discharges it to the drainage system through a trap. Its flush volume, trapway, and fixture-unit rating must meet code and water-efficiency standards.
- Flushometer
- Related: Water closet, Vacuum breaker
A flush valve that uses line pressure to deliver a measured flush to a fixture, commonly found on commercial toilets and urinals. It requires adequate flow and pressure and often needs a vacuum breaker.
- Water hammer
- Related: Pressure-reducing valve (PRV), Peak demand
A pressure surge caused by sudden stopping of water flow, producing banging noises and stressing pipes and fittings. Arrestors, properly sized piping, and slow-closing valves reduce the effect.
- Water hammer arrestor
- Related: Water hammer, Pressure-reducing valve (PRV)
A device containing a trapped air chamber or piston that absorbs the pressure spike created when flow stops abruptly. It is installed near quick-closing valves to protect piping and fixtures.
- Pressure-reducing valve (PRV)
- Related: Peak demand, Water hammer
A valve that lowers incoming water pressure to a safe, code-compliant level for downstream fixtures and piping. It protects against excessive pressure that can damage fixtures and cause noise or leaks.
- Thermal expansion tank
- Related: Temperature and pressure relief (T&P) valve, Backflow
A tank installed on a closed potable water system to absorb the volume increase caused by heating water. Without it, pressure can rise to unsafe levels and cause relief valve discharge or pipe failure.
- Temperature and pressure relief (T&P) valve
- Related: Thermal expansion tank, Water heater
A safety device on a water heater that opens to discharge water if temperature or pressure exceeds set limits. It must be piped to a safe drain and never plugged or capped.
- Water heater
- Related: Temperature and pressure relief (T&P) valve, Thermal expansion tank
An appliance that heats potable water for domestic use, available in storage, tankless, and indirect types. Installation requires proper venting, relief protection, seismic or thermal safeguards, and clearance from combustibles.
- Recirculation loop
- Related: Water heater, Peak demand
A piping arrangement that continuously or periodically moves hot water through the system so taps receive hot water quickly. It reduces wait time and water waste but requires balancing and insulation to limit heat loss.
- Permit
- Related: Authority having jurisdiction (AHJ), Inspection
An official authorization issued by the authority having jurisdiction before plumbing work begins, confirming plans and contractor qualifications meet code. Work without a required permit can lead to stop-work orders and penalties.
- Authority having jurisdiction (AHJ)
- Related: Permit, Inspection
The organization or official responsible for enforcing the plumbing code and approving installations, materials, and permits. The AHJ interprets code requirements and conducts or authorizes inspections.
- Inspection
- Related: Rough-in inspection, Permit
A formal review of plumbing work by the AHJ at defined stages, such as rough-in, top-out, and final, to verify code compliance. Approval at each stage is usually required before work is concealed or put into service.
- Rough-in inspection
- Related: Inspection, Hydrostatic test
A code inspection performed after piping, fittings, and fixture supports are installed but before walls, floors, or ceilings are closed. It verifies pipe sizing, slope, venting, and test results before concealment.
- Hydrostatic test
- Related: Rough-in inspection, Inspection
A pressure test in which a system is filled with water and held at a specified pressure for a set period to reveal leaks. Drainage systems may instead be tested with air or water per code requirements.
- Change order
- Related: Punch list, Permit
A written document that formally modifies the scope, price, or schedule of a construction contract after work has begun. Proper documentation protects the contractor's right to payment for added or changed work.
- Punch list
- Related: Change order, Inspection
A record of incomplete or defective items identified near the end of a project that must be corrected before final acceptance and closeout. Clearing it is typically a condition of final payment.
- Lockout/tagout (LOTO)
- Related: Confined space entry, Personal protective equipment (PPE)
A safety procedure that isolates energy sources and attaches warning tags before servicing equipment, preventing accidental startup or release of stored energy. It is required for work on pumps, heaters, and electrical components.
- Confined space entry
- Related: Lockout/tagout (LOTO), Personal protective equipment (PPE)
The controlled process of entering a space with limited access and ventilation that is not designed for occupancy, such as a vault or sewer. It requires atmospheric testing, permits, attendants, and rescue planning.
- Personal protective equipment (PPE)
- Related: Lockout/tagout (LOTO), Confined space entry
Gear such as gloves, eye protection, respirators, and hearing protection worn to reduce exposure to workplace hazards. Employers must provide suitable PPE and train workers in its correct use and limitations.