NITC Master Plumber study materials
NITC Master Plumber study resources

NITC Master Plumber: System Testing, Inspection, and Troubleshooting

NITC Master Plumber · Work through your exam, one topic at a time.

All guide sections

System Testing, Inspection, and Troubleshooting

System Testing, Inspection, and Troubleshooting asks you to prove the work and then diagnose failures from the symptom.

Tests you must know

  • DWV water test: fill to 10 ft of head above the highest point, hold 15 minutes, no drop. Plug or cap all openings and restrain the plugs.
  • DWV air test where permitted: typically about 5 psi with a gauge on the system for 15 minutes. It is dangerous on plastic if the cement is not fully cured, so never over-pressurize.
  • Water supply: hydrostatic test at 100 psi, or working pressure plus a margin, for 60 minutes; read the gauge, not the joint.
  • Gas piping: a separate test at the pressure the code sets for the system size, with the gauge isolated from the source.
  • Smoke or peppermint for vents; dye and camera for drain leaks.

Inspection flow

  • Rough-in before concealment: verify slope, strap spacing, cleanouts, vent height, firestopping at penetrations, and access to valves.
  • Final: run water at the farthest fixture, check flow and temperature, verify fixture security and trap seals, and look for leaks at the meter.

Troubleshooting by symptom

  • Gurgling and slow drains at many fixtures: main line or building vent blockage, not a fixture trap.
  • Sewer odor in one bathroom: a dry trap or a wet vent that has lost its seal.
  • Banging on shutoff: water hammer from missing arrestors or a failed PRV.
  • T&P discharge with no overheating: closed system without an expansion tank.

Worked example

Top-floor fixtures drain slowly while lower-floor fixtures are fine. The suspect is the stack vent or a blockage in the stack above the highest lower-floor connection: lower fixtures still drain by gravity into an unobstructed lower stack, while the top floor pulls air through the restriction.

Traps

Air-testing plastic DWV at high pressure, testing before solvent cement cures, accepting a pressure drop without checking gauge temperature effects, and covering a joint that failed.