NJ Registered Journeyman Electrician · Keep the key ideas within reach.

Quick reference

Electrical Contracting Practice and Theory

  • Ohm's law: E = I × R; power P = E × I = I²R = E²/R. Single-phase power in watts equals volts times amps times power factor.

  • Three-phase power: P = √3 × E × I × PF for balanced loads; line current equals phase current in wye, and equals √3 times phase current in delta.

  • Voltage drop (single-phase, copper): VD = 2 × K × I × L / CM, where K ≈ 12.9 ohm-cmil/ft for copper and 21.2 for aluminum; L in feet, CM in circular mils.

  • Ampacity derating: apply adjustment for conductor count in a raceway (NEC Table 310.15(C)(1)) and correction for ambient temperature (Table 310.15(B)(1)) before applying overcurrent or termination limits.

  • Conductor sizing sequence: start with load calc (Article 220), select conductor for ampacity, then size overcurrent device, then verify termination temperature rating per 110.14(C).

  • Standard load calculation for a dwelling: 3 VA/sq ft general lighting, 1,500 VA per small-appliance branch circuit, 1,500 VA laundry, then apply Table 220.42 demand factors.

  • Box fill: count each unbroken conductor as one, each conductor entering and terminating as one, each device yoke as two, each equipment grounding conductor as one, then compare to Table 314.16(B) volume.

  • Motor branch circuit: overload protection sized per 430.32 based on nameplate current, branch-circuit short-circuit protection per Table 430.52, conductors at 125% of Table 430.250 FLC.

Quick reference

National Electrical Code and New Jersey Electrical Regulations

  • New Jersey adopts the NEC through the Uniform Construction Code (N.J.A.C. 5:23); the electrical subcode is enforced by the local construction official and electrical subcode official.

  • NEC Article 90 covers scope and enforcement; Article 100 defines terms such as 'listed', 'labeled', 'approved', and 'accessible'. Informational notes are not enforceable requirements.

  • NEC 90.4 grants the authority having jurisdiction interpretive and approval authority; in New Jersey the AHJ is the municipal or county construction office, not the state board.

  • Chapter 9 tables govern raceway fill (Table 1), conductor properties (Table 8), and Annex C provides conduit fill by conductor size and type.

  • NEC 210.8 requires GFCI protection for dwelling bathroom, kitchen, laundry, garage, outdoor, and unfinished-basement receptacles; 210.12 requires AFCI protection for most dwelling branch circuits.

  • NEC 250 grounding and bonding: 250.52 grounding electrode systems, 250.66 grounding electrode conductor sizing, 250.122 equipment grounding conductor sizing based on overcurrent device rating.

  • NEC 310.16 ampacities apply to not more than three current-carrying conductors in a raceway or cable at 30°C ambient; higher ambient or more conductors require correction or adjustment.

  • Local amendments and interpretations are published by the New Jersey Department of Community Affairs; where the NEC and the UCC conflict, the UCC governs.

Quick reference

Electrical Installation, Wiring Methods, and Safety

  • NM-B cable is permitted in dwellings but not in wet locations, masonry block, or where subject to physical damage; it must be secured within 12 in. of boxes and every 4.5 ft (334.30).

  • MC and AC cable require support every 6 ft and within 12 in. of boxes; MC installed in wet locations needs corrosion-resistant jacket and fittings (330.10, 330.30).

  • RMC and IMC must be supported within 3 ft of each box and every 10 ft; EMT within 3 ft and every 10 ft; PVC Schedule 40 every 3 ft (344.30, 342.30, 358.30, 352.30).

  • Receptacles in dwelling units: no point along the floor line may be more than 6 ft from a receptacle (210.52), and kitchen counter receptacles must be spaced so no point exceeds 24 in. from a receptacle.

  • Working clearance at electrical equipment is 30 in. wide, 36 in. deep, and 6 ft 6 in. high (110.26); 36 in. depth increases to 42 in. or 48 in. at higher voltages.

  • Boxes must be covered; unused openings in enclosures must be closed with listed plugs or plates (408.7). Splices must be made in listed boxes or fittings and remain accessible (300.15).

  • Bonding: metal raceways, cable armor, and metal water piping must be bonded; a bonding jumper around water meters and insulating joints is required (250.68, 250.104).

  • Temporary power and portable tools on construction sites require GFCI protection; assured equipment grounding conductor programs are permitted under 590.6.

Quick reference

New Jersey Electrical Contractors Licensing Act of 1962 and Board Rules

  • The Electrical Contractors Licensing Act of 1962 (N.J.S.A. 45:5A) established the Board of Examiners of Electrical Contractors and requires licensure to engage in electrical contracting in New Jersey.

  • License classes: Electrical Contractor, Qualified Journeyman, and Apprentice. Only a licensed Electrical Contractor may bid, contract, or advertise for electrical work.

  • A licensed Electrical Contractor must have a qualified licensee (master-level) responsible for supervision; the business must be registered with the Board and the Division of Consumer Affairs.

  • Journeyman applicants must meet experience and education requirements set by the Board and pass the Board examination; licenses require renewal and continuing education.

  • The Board may refuse, suspend, or revoke a license for fraud, gross negligence, incompetence, or violation of the Act; it may also impose civil penalties.

  • Unlicensed electrical contracting is a violation subject to penalties under N.J.S.A. 45:5A; a journeyman may perform electrical work only under the supervision of a licensed contractor.

  • Advertising and business names must not misrepresent licensure status; a licensee must display license number on business documents as required by Board regulation.

  • Apprentices must be registered with the Board and work under direct journeyman or contractor supervision; apprentice hours count toward journeyman qualification.