NJ Registered Journeyman Electrician · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Electrical installation, wiring methods, and safety (official content outline not published in source) & National Electrical Code and applicable New Jersey electrical regulations (official content outline not published in source)

  • Map every wiring-method Article in NEC Chapter 3 (300, 310, 320-340, 350-362, 376-392, 394, 396-399) to a one-line scope note in your own words

  • Trace the Chapter 1-4 dependency chain for a single branch circuit: 210 load calcs, 220 feeder/service calcs, 240 overcurrent protection, 250 grounding and bonding, 300 wiring methods

  • Build a tabbed code-book index marking the ten Articles you use most often and the tables you will actually look up under time pressure (310.16, 250.122, 310.15(B)(3)(a), 430.52, 250.66)

  • Solve fifteen ampacity-and-derating problems using 310.15 and 310.16, writing the correction and adjustment steps in order every time

  • Recite the Chapter 3 Article numbering scheme from memory and flag the three Articles you cannot yet summarize

Your checkpoint

A one-page wiring-method selection matrix (raceway vs cable vs open wiring, wet/dry/corrosive location, support and securing rules) plus a scored set of 15 derating problems with worked steps

Week 2

Electrical installation, wiring methods, and safety (official content outline not published in source) & Electrical contracting practice and theory (official content outline not published in source)

  • Calculate box fill per 314.16 and pull-box sizing per 314.28 for straight, angle, and U pulls, working ten mixed examples

  • Size conductors and overcurrent protection for a residential service using 220.82 optional method and 310.16, documenting each step

  • Apply 250 grounding and bonding rules to a service, a subpanel, and a separately derived system, distinguishing grounding-electrode from equipment-grounding conductors

  • Lay out a conduit run with bend counts, 358.26 pull-point limits, and 300.34 conductor bending radius checks

  • Explain the difference between a grounded conductor, grounding conductor, and bonding jumper using three code citations each

Your checkpoint

A complete residential service calculation worksheet (load calc, conductor sizing, OCPD, grounding electrode conductor, box fill) with every citation written in the margin

Week 3

Electrical contracting practice and theory (official content outline not published in source) & Electrical installation, wiring methods, and safety (official content outline not published in source)

  • Perform motor branch-circuit and feeder calculations per Article 430, including 430.52 overload and short-circuit protection and 430.24 feeder sizing

  • Size transformers and apply Article 450 overcurrent protection plus 240.21 tap rules to three tap scenarios

  • Compute voltage drop for feeders and branch circuits and state when it becomes a design rather than code issue

  • Analyze three-phase versus single-phase load balancing and neutral loading for nonlinear loads

  • Work twenty mixed theory problems (Ohm's law, power, power factor, impedance) under a 25-minute timer

Your checkpoint

A worked problem set of 20 motor, transformer, tap-rule, and voltage-drop calculations with an accuracy log noting every miss and its root cause

Week 4

National Electrical Code and applicable New Jersey electrical regulations (official content outline not published in source) & Electrical contracting practice and theory (official content outline not published in source)

  • Locate and summarize the New Jersey administrative provisions that adopt and amend the NEC, including the edition in force and the Uniform Construction Code relationship

  • Outline the permit, inspection, and certificate-of-occupancy sequence for a residential service upgrade and a commercial tenant fit-out

  • Identify which work requires plan review and which licensed trade holds jurisdiction at each step

  • List the NEC Articles most frequently cited on failed inspections and the specific violation each represents

  • Draft a one-page inspection-readiness checklist a crew could use on site

Your checkpoint

A New Jersey permit-to-inspection flow diagram for two project types, with the adopting regulation and NEC edition cited at each node

Week 5

National Electrical Code and applicable New Jersey electrical regulations (official content outline not published in source)

  • Build a lookup drill for Chapter 2 and Chapter 4 Articles (210, 215, 220, 225, 230, 240, 250, 280, 285, 404, 406, 408, 410, 422, 424, 430, 440, 450) and complete 40 timed index-lookup questions

  • Distinguish special-location Articles in Chapter 5 (500-517, 525, 547, 550-552, 555, 590) by occupancy and the extra rules each imposes

  • Apply Chapter 6 and 7 requirements for equipment and special conditions (625 EV charging, 690 solar, 700-702 emergency systems, 705 interconnected sources)

  • Practice reading exceptions, fine print notes, and informational notes correctly, since only the first two are enforceable

  • Write a personal list of the 15 code sections you most often misremember and a memory hook for each

Your checkpoint

A timed 40-question lookup log with per-question find time, target under 90 seconds, and a ranked list of your slowest Articles

Week 6

New Jersey Electrical Contractors Licensing Act of 1962 and Board rules (official content outline not published in source) & Electrical contracting practice and theory (official content outline not published in source)

  • Summarize the New Jersey Electrical Contractors Licensing Act of 1962: who must be licensed, the license classifications, and the qualifying-licensee concept

  • Outline Board rules on license applications, examinations, renewals, continuing education, and lapses

  • Describe the disciplinary process: complaint, investigation, hearing, penalties, suspension, and revocation, and the grounds for each

  • Explain business-practice requirements: advertising, contract terms, bonding or insurance, and supervision of unlicensed employees

  • Draft a compliance checklist a small electrical contracting business could follow from license application through renewal

Your checkpoint

A two-page licensing compliance summary covering licensure, qualifying licensee duties, renewal and CE, and discipline, each point tied to its statutory or rule source

Week 7

New Jersey Electrical Contractors Licensing Act of 1962 and Board rules (official content outline not published in source) & National Electrical Code and applicable New Jersey electrical regulations (official content outline not published in source)

  • Resolve ten scenario questions on unlicensed practice, bid and contract requirements, and Board jurisdiction over licensees

  • Reconcile the Act and Board rules with the Uniform Construction Code where the two overlap on inspections and enforcement

  • Review ethics and consumer-protection obligations: estimates, change orders, liens, and handling complaints

  • Re-drill your weakest 30 code lookups from week 5 and confirm each find time is under 90 seconds

  • Recompute three calculations from weeks 2-3 without notes to confirm retention

Your checkpoint

A scored 25-question mixed set covering licensing law and code, with written explanations for every wrong answer and a revised weak-area list

Week 8

Electrical contracting practice and theory (official content outline not published in source) & National Electrical Code and applicable New Jersey electrical regulations (official content outline not published in source) & Electrical installation, wiring methods, and safety (official content outline not published in source) & New Jersey Electrical Contractors Licensing Act of 1962 and Board rules (official content outline not published in source)

  • Take two full-length timed practice exams under test conditions and record section-by-section scores

  • Review every missed question to root cause: code lookup failure, calculation error, licensing-law gap, or misread question

  • Re-drill the 20 code sections and 10 licensing rules that produced the most misses

  • Rehearse exam-day logistics: allowed references, tab strategy, time per question, and a skip-and-return rule

  • Confirm your weakest domain has moved above your target score threshold on the second practice exam

Your checkpoint

A final score report comparing both practice exams by domain, with a one-page exam-day plan and a short list of items to review the night before

Milestones

Week 2: Complete the residential service worksheet end to end without reference to a worked example, and score at least 14 of 15 on the derating set from week 1

Week 4: Explain the New Jersey permit and inspection sequence aloud in under five minutes and score at least 70 percent on a self-made 20-question quiz covering weeks 1-3 calculations

Week 6: Average code-lookup find time at or below 90 seconds across 40 questions and score at least 75 percent on the licensing-law summary quiz without notes

Week 8: Score at least 75 percent on both full-length practice exams with no domain below 65 percent, and show improvement from exam one to exam two