NM General Contractor · Keep the key ideas within reach.

Quick reference

Business and Financial Management

  • Working capital = current assets − current liabilities; it measures the cash cushion available to fund payroll, materials, and retainage gaps on active jobs.

  • Retainage receivable is an asset, not cash: track aged retainage by project and bill it as a separate line so collection lag does not distort monthly cash flow.

  • Break-even revenue = total fixed overhead ÷ gross margin percentage; a firm with $300,000 overhead and 20% margin needs $1,500,000 in annual volume before profit.

  • Gross profit = contract revenue − direct job costs (labor, material, equipment, subcontract). Overhead, interest, and taxes are excluded from job gross profit.

  • Under the completed-contract method, revenue and cost are recognized only when the job is substantially complete; percentage-of-completion recognizes revenue in proportion to costs incurred to date.

  • Job cost codes must separate labor burden (payroll taxes, insurance, benefits) from base wage; burden typically runs 25–40% of base wage for field labor.

  • A financial statement prepared by a CPA (reviewed or audited) is generally required to obtain bonding capacity beyond small single-job limits.

  • Cash flow forecast horizon should cover at least one full billing cycle plus retainage lag, because pay-when-paid clauses can delay receipts 60–90 days.

  • Equipment cost can be charged to jobs by internal rental rate (ownership + operating cost per hour) rather than actual purchase price, smoothing cost allocation.

Quick reference

New Mexico Contractor Licensing Law and Regulation

  • Contractor licensing in New Mexico is administered by the Construction Industries Division (CID) of the Regulation and Licensing Department; the General Contractor (GB-98) license is the classification for general building work.

  • License classifications are tied to trade scope (e.g., GB-98 general building, GF-98 general construction, and specialty trades); bidding or contracting outside your licensed classification is grounds for discipline.

  • A qualifying party must pass the applicable trade and business/law examinations and hold the license through the contracting entity; loss of the qualifying party generally requires replacement within a set period.

  • License renewal is periodic, and continuing education and fee payment are conditions of keeping the license active; working on a lapsed license exposes the contractor to unlicensed-contract remedies.

  • New Mexico requires proof of a license to pull permits for licensed trades; permits are issued by CID or delegated local jurisdictions depending on the authority having jurisdiction.

  • Contractors must carry workers' compensation coverage for employees and provide proof; failure to maintain required coverage can result in license suspension.

  • Unlicensed contracting can render a contract unenforceable for collection of compensation and subjects the contractor to citations and civil penalties.

  • License number must appear on advertisements, bids, and contracts as required by CID rules; misrepresenting license status is a violation.

  • Change orders, subcontracts, and proposals should identify the license classification and number to avoid disputes over scope authority.

Quick reference

Project Administration and Contract Management

  • Contract types: lump sum (fixed price, risk on contractor), unit price (paid per measured quantity), cost-plus (reimbursable cost plus fee), and GMP (guaranteed maximum price with savings share).

  • A pay-when-paid clause ties subcontractor payment to owner payment to the prime; a pay-if-paid clause can shift the risk of owner nonpayment more fully to the subcontractor depending on jurisdiction.

  • Retainage is typically 5–10% withheld from progress payments; release timing is governed by contract and New Mexico prompt-payment provisions.

  • Substantial completion triggers warranty start, retainage release eligibility, and often partial release of liquidated damages exposure; punch list items are completed after substantial completion.

  • Liquidated damages must be a reasonable forecast of probable loss at contract formation; unenforceable penalty clauses are those disproportionate to anticipated harm.

  • Notice requirements are conditions precedent: late notice of delay, differing site conditions, or change can waive entitlement regardless of merit.

  • A differing site condition claim generally requires prompt written notice, documentation of the physical condition, and proof the condition differed materially from the contract documents.

  • Record-keeping for claims should include daily reports, photos, weather logs, correspondence, and cost segregation so delay and impact costs can be substantiated.

  • Closeout package typically includes as-builts, O&M manuals, warranties, lien waivers, final lien releases, and consent of surety where bonds apply.

Quick reference

Estimating and Bidding

  • Quantity takeoff: measure net quantities from drawings and specs, then apply waste/overlap factors separately so the takeoff stays auditable.

  • Unit costs should separate material, labor, equipment, and subcontract; applying a single composite unit price hides the drivers of variance.

  • Labor hours = quantity ÷ crew productivity rate; labor cost = hours × crew average wage × (1 + burden).

  • Bid strategy: add project indirect costs (supervision, temporary facilities, permits, insurance, bond premium) before applying markup for overhead and profit.

  • Bond premium for performance and payment bonds is typically a percentage of contract value, tiered by contract size, and must be carried in the bid.

  • Contingency should reflect identifiable risk (unknowns, escalation, weather) and is not the same as profit; track contingency drawdown separately.

  • Escalation: apply material price escalation for the period between bid and installation using published indices or vendor quotes with validity dates.

  • Balanced bidding avoids front-loading or unbalancing unit prices; unbalanced bids can be rejected and create cash-flow and dispute risk.

  • Bid documents review should confirm addenda acknowledgment, alternates, allowances, unit-price schedules, and specified substitutions before submission.

Quick reference

Construction Planning, Scheduling, and Controls

  • Critical path method (CPM): the critical path is the longest path through the network; total float = late start − early start (or late finish − early finish).

  • Free float is the delay a activity can absorb without delaying any successor; total float is delay without delaying project finish.

  • A forward pass computes early start/finish; a backward pass computes late start/finish; float is the difference.

  • Crash cost slope = (crash cost − normal cost) ÷ (normal duration − crash duration); crash the lowest-slope activity on the critical path first.

  • Resource leveling changes start/finish dates to resolve resource peaks; resource smoothing adjusts within float without changing the critical path.

  • Earned value: CV = EV − AC; SV = EV − PV; CPI = EV ÷ AC; SPI = EV ÷ PV. CPI below 1.0 means cost overrun.

  • Estimate at completion (EAC) = BAC ÷ CPI when current cost performance is expected to continue; EAC = AC + (BAC − EV) when remaining work is at budget.

  • Schedule updates should record actual start/finish and remaining duration; comparing updates distinguishes excusable delay from contractor-caused delay.

  • Look-ahead schedules (3–6 week) convert the master schedule into short-interval work plans and expose material and crew constraints.

Quick reference

Site Safety and Environmental Compliance

  • OSHA fall protection for general construction is required at 6 feet or more above a lower level; guardrails, safety nets, or personal fall arrest systems are acceptable systems.

  • Excavations 5 feet or deeper require a protective system (sloping, shoring, or shielding) unless the excavation is entirely in stable rock; a competent person must inspect daily.

  • Scaffold users must be trained; scaffolds must be erected, moved, or altered only under the supervision of a competent person and inspected before each shift.

  • Hazard communication (HazCom) requires a written program, Safety Data Sheets, labeling, and employee training for chemicals on site.

  • Personal protective equipment: head, eye, face, foot, and hand protection per hazard assessment; hearing protection when noise exceeds 85 dBA time-weighted average.

  • Cranes and rigging: load charts, qualified operators, and exclusion zones under suspended loads; never work under a suspended load.

  • Environmental: stormwater pollution prevention plan (SWPPP) with best management practices for erosion and sediment control; inspections after rain events.

  • Hazardous waste and spills: reportable quantity releases require notification; fuels and chemicals stored with secondary containment.

  • Silica and other dust controls: wet cutting, ventilation, and respiratory protection per exposure assessment under OSHA respirable crystalline silica standard.

Quick reference

Construction Means, Methods, and Materials

  • Concrete: water-cement ratio controls strength and durability; lower w/c ratio increases strength and reduces permeability. Curing maintains moisture and temperature for strength gain.

  • Concrete placement: consolidation by vibration removes air voids; cold joints form where fresh concrete is placed against already-set concrete and require proper bonding treatment.

  • Reinforcing steel: development length depends on bar size, concrete strength, and cover; lap splices transfer load through bond and must meet code length.

  • Structural steel connections: bolted (bearing vs. slip-critical) and welded; slip-critical connections resist shear through friction and require specified surface preparation.

  • Masonry: mortar joints, flashing, and weep holes manage moisture; control joints accommodate movement and shrinkage.

  • Wood framing: grading, moisture content, and fastening schedule govern performance; engineered lumber requires protection from moisture before enclosure.

  • Mechanical/electrical/plumbing rough-in coordination uses sleeve and penetration schedules; firestopping at rated assemblies must match the listed system.

  • Roofing: low-slope membrane systems (TPO, EPDM, modified bitumen) rely on proper slope, insulation, and flashing details to shed water.

  • Soils and earthwork: compaction to specified relative density or percentage of maximum dry density per standard proctor; moisture content near optimum for efficient compaction.