The New Mexico General Contractor credential is a construction contractor license issued by the Construction Industries Division (CID) of the New Mexico Regulation and Licensing Department. CID describes its mission as protecting consumers by regulating the industry, licensing contractors, enforcing licensing laws, and requiring licensure for any person practicing or offering to practice construction contracting. The NM General Contractor study guide has 7 sections and about 2,682 words.

01

Business and Financial Management

This domain tests whether you can run a contracting business, not just build: entity choice, job costing, financial statements, insurance, bonding capacity, payroll burden, and New Mexico gross receipts tax (GRT). Expect scenario arithmetic rather than definitions.

407 words, about 2 min
02

New Mexico Contractor Licensing Law and Regulation

This domain tests the rules administered by the Construction Industries Division (CID) of the New Mexico Regulation and Licensing Department, with rules adopted by the Construction Industries Commission: who must be licensed, what a license authorizes, how permits and inspections work, and what happens when you operate without one. Contractors and subcontractors performing construction work in New Mexico must hold a CID license when the project's combined labor and materials reach the statutory threshold (currently $10,000).

412 words, about 2 min
03

Project Administration and Contract Management

This domain tests administration of the contract after award: delivery methods and contract types, the order of precedence among documents, changes, notice requirements, time and delay, payment, and closeout. Most exam items turn on who was required to give what notice, in writing, and when.

400 words, about 2 min
04

Estimating and Bidding

This domain tests how a bid is built and defended: quantity takeoff, pricing labor and material, indirect costs, bid-day decisions, and the errors that turn a winning bid into a losing job. Expect unit-conversion arithmetic.

338 words, about 2 min
05

Construction Planning, Scheduling, and Controls

This domain tests planning and control tools: work breakdown, critical path method, float, resource management, schedule updates, and earned value progress measurement. Break the job into a work breakdown structure, then into activities with durations and logical ties (finish-to-start, start-to-start, finish-to-finish) including lags.

359 words, about 2 min
06

Site Safety and Environmental Compliance

This domain tests OSHA construction standards (29 CFR 1926) as enforced under New Mexico's state plan, plus environmental obligations that apply on site: stormwater, air quality, asbestos and lead, and waste. Fall protection is required at 6 ft in construction (10 ft for scaffolds).

406 words, about 2 min
07

Construction Means, Methods, and Materials

This domain tests whether you know how the work is actually built and what inspection or testing proves it was built correctly: soils and compaction, concrete, masonry, steel, wood framing, envelope, and finishes. Structural fill is placed in lifts (commonly 6–8 in) and compacted to a specified percentage of maximum dry density from a proctor test, verified by field density tests.

360 words, about 2 min