NM General Contractor study plan
NM General Contractor · Give each week a clear focus.
8 weeks · About 7 hours per week
Business and Financial Management & New Mexico Contractor Licensing Law and Regulation
Build a one-page formula sheet covering markup vs. margin, overhead allocation, retainage, and simple break-even, then solve five numeric problems without notes
Reconstruct the contractor license classification tiers and the dollar/scope limits that attach to each, from memory, on a blank sheet
Map the license application, qualifying-party, and renewal requirements into a dated checklist you can act on
Draft a cash-flow timeline for a hypothetical 90-day job showing when mobilization, progress billing, retainage release, and supplier payments land
Your checkpoint
A two-page reference sheet: financial formulas on one side, licensing requirements and thresholds on the other, both written without looking at source material.
Business and Financial Management & New Mexico Contractor Licensing Law and Regulation
Work through ten lien and payment-bond scenarios and state who can claim, against whom, and within what window
Compute gross profit, net profit, and overhead recovery for two sample jobs with different contract types (lump sum vs. cost-plus)
List the disciplinary actions and complaint paths the licensing authority can pursue, and match each to a violation type
Practice explaining to a fictional client why an unlicensed contract may be unenforceable
Your checkpoint
A 15-question self-quiz you write yourself on financial management and licensing law, with an answer key and a short note on every wrong answer.
Project Administration and Contract Management & Estimating and Bidding
Identify the standard contract documents, the order of precedence among them, and the notice deadlines that most often cause disputes
Build a change-order workflow diagram from request to executed modification, naming who signs at each step
Perform a quantity takeoff for a small concrete slab and a stud wall, showing unit conversions explicitly
Assemble a bid from that takeoff: labor, material, equipment, overhead, contingency, and markup, with each line labeled
Your checkpoint
A complete sample bid package for one small scope: takeoff sheet, priced estimate, and a one-page list of assumptions and exclusions.
Estimating and Bidding & Construction Planning, Scheduling, and Controls
Compare lump-sum, unit-price, and cost-plus bidding and state the risk shift in each
Build a critical path schedule for a 20-activity residential or tenant-improvement project, identifying the critical path by hand
Calculate float for at least three activities and explain what happens to the project when a critical activity slips a week
Write the submittal, RFI, and shop-drawing tracking process as a numbered procedure
Your checkpoint
A network diagram plus bar-chart schedule for your 20-activity project, with the critical path marked and float values shown for at least three activities.
Construction Planning, Scheduling, and Controls & Site Safety and Environmental Compliance
Set up earned-value tracking on your sample project: compute planned value, earned value, cost variance, and schedule variance at a mid-project checkpoint
Describe how you would recover a project running two weeks behind without adding overtime, listing three specific levers
Build a site-specific safety plan outline covering hazard assessment, competent-person duties, and disciplinary enforcement
Identify the training and documentation obligations that attach to the major hazard categories on a typical commercial site
Your checkpoint
A one-page project controls dashboard (schedule status, cost status, open RFIs, open change orders) plus a one-page site safety plan outline for the same project.
Site Safety and Environmental Compliance & Construction Means, Methods, and Materials
Walk a real or imagined site and produce a hazard log of at least 15 items, each with a control and a responsible party
Explain fall protection, excavation, scaffolding, and electrical safety requirements accurately enough to teach them to a new hire in five minutes each
Match structural, envelope, and finish materials to their correct installation sequence and common failure modes
Describe concrete placement, curing, and testing requirements, including when cylinders are taken and what the results trigger
Your checkpoint
A hazard log with 15 controlled items plus a materials-and-methods flashcard set of 25 cards covering the domain 7 topics most likely to be tested.
Project Administration and Contract Management & Construction Means, Methods, and Materials
Close out a mock project: punch list, substantial completion, final payment, warranty package, and as-built turnover, each with the document that proves it
Resolve three contract dispute scenarios using the contract terms you identified in week 3, citing the specific clause type
Identify the inspection and testing milestones that must be scheduled before concealment on a typical commercial build
Re-derive the material properties and installation tolerances most often confused on the exam, and correct your own earlier errors
Your checkpoint
A closeout checklist with every document named, plus written resolutions to three dispute scenarios that cite the governing contract provision.
Business and Financial Management & New Mexico Contractor Licensing Law and Regulation & Project Administration and Contract Management & Estimating and Bidding & Construction Planning, Scheduling, and Controls & Site Safety and Environmental Compliance & Construction Means, Methods, and Materials
Take two full-length timed practice exams under test conditions and score them by domain
Rank your domains from weakest to strongest by practice-exam percentage and re-drill the three weakest for two hours total
Rewrite your week 1 formula sheet and licensing sheet from memory and compare against the originals to find residual gaps
Review every missed question across all eight weeks and write the underlying rule, not just the right answer, for each
Your checkpoint
A final one-page gap report listing your three weakest domains, the specific rules you still miss, and a dated retake plan.
Milestones
Week 2: You can state the licensing thresholds and the markup-vs-margin distinction correctly on a blank page, and you score at least 80% on your own week 2 self-quiz.
Week 4: Your sample bid totals reconcile line by line, and you can trace the critical path through your 20-activity schedule without referring to notes.
Week 6: Your hazard log covers all major hazard categories with a named control for each, and you can explain earned-value variances on your sample project in plain language.
Week 8: Both timed practice exams are complete, scored by domain, and your weakest three domains show measurable improvement over the first attempt.