NZ Certifying Drainlayer · Keep the key ideas within reach.

Quick reference

Legislation, regulations and standards for drainlaying

  • Drainage work for a building is building work under the Building Act 2004 and needs a building consent unless it falls within an exemption in Schedule 1.

  • Relevant Building Code clauses: G13 Foul Water, G14 Industrial Liquid Waste, E1 Surface Water, and G12 for backflow prevention on water supplies.

  • Core technical standards: AS/NZS 3500.2 (sanitary plumbing and drainage), AS/NZS 3500.3 (stormwater drainage), AS/NZS 1547 (on-site domestic wastewater).

  • Drainlayers must be registered and licensed under the Plumbers, Gasfitters and Drainlayers Act 2006; licensing is by class, and work must stay within that class.

  • A certifying drainlayer is authorised to certify specified drainage work and issue the associated certification instead of the work being inspected by the building consent authority.

  • Discharge to a public sewer is controlled by the territorial authority's trade waste bylaw; a written trade waste consent is required where the bylaw applies.

  • Connection to, or work near, council-owned public drains requires council approval; the public drain is not the drainlayer's asset to alter.

  • The Health and Safety at Work Act 2015 applies to every drainage site, including subcontractors, and duties fall on all PCBUs.

  • AS/NZS 3500.2 is the reference standard cited in compliance documents for gradients, venting, support and testing of sanitary drainage.

Quick reference

Drainage system design, hydraulics and falls

  • Grade as a percentage = (fall / length) x 100; a 1:60 ratio equals 1.67% and a 1:100 ratio equals 1.0%.

  • Typical NZ minimum self-cleansing grades: DN100 at 1:60 and DN150 at 1:100; flatter grades require justification and often more cleaning access.

  • Self-cleansing velocity is about 0.6-0.75 m/s at peak dry weather flow; velocities above roughly 3 m/s risk scour and pipe abrasion.

  • Capacity uses Q = V x A; Manning's roughness n is about 0.011 for uPVC and 0.013 for concrete, with Colebrook-White used for full-bore checks.

  • Stack, drain and vent sizes are selected from discharge unit (DU) tables in AS/NZS 3500.2, not by counting fixtures alone.

  • Trap seal depth is a minimum 50 mm and must be protected by venting so siphonage and back-pressure do not break the seal.

  • Unvented branch and drain lengths are limited by the tables in AS/NZS 3500.2; exceeding them requires additional venting or relief.

  • The hydraulic grade line must stay below the overflow level of the lowest fixture served; surcharge of an upstream gully trap is a design failure.

  • Foul water and stormwater are designed as separate systems wherever practicable, and E1 requires secondary flow paths for stormwater.

Quick reference

Site assessment, ground conditions and earthworks

  • Levels are referenced to NZVD2016 or an approved local datum; never mix datums on one job, and confirm invert levels against the drawings before trenching.

  • Soils are classified to AS 1726 / NZGS guidelines; expansive clays, peat, uncontrolled fill and rock each change bedding, pipe class and cover requirements.

  • Groundwater standing above the invert requires dewatering, and empty pipes or tanks must be checked for flotation.

  • Trench width is commonly pipe outside diameter plus 300 mm with a 600 mm practical minimum, giving room for haunching and compaction.

  • Typical minimum cover is 300 mm under gardens and landscaping, increased (commonly 600 mm or more) under driveways and vehicle loading.

  • Excavations deeper than 1.5 m must be shored, benched or battered, and inspected daily by a competent person.

  • Trench bottom is trimmed true to grade, free of loose spoil and soft spots; over-excavation is backfilled with approved granular material, not spoil.

  • Percolation (falling head) testing of the disposal area is required before sizing on-site effluent application beds.

  • Spoil, contaminated soil and asbestos-containing material are classified and disposed of to an approved facility with records kept.

Quick reference

Pipe materials, components, jointing and bedding

  • uPVC sewer pipe to AS/NZS 1260 is supplied in stiffness classes SN4, SN8 and SN16; class is selected for depth, soil and traffic loading.

  • Polyethylene pipe to AS/NZS 4130 (PE80 or PE100) is pressure rated in PN classes and joined by butt fusion or electrofusion.

  • Concrete pipe to AS/NZS 4058 uses rubber ring roll-on joints and pipe classes selected for crush load and cover.

  • Solvent cement jointing of uPVC: cut square, chamfer, clean, apply primer and cement, push fully home with a quarter turn, and hold until set.

  • Rubber ring joints are lubricated only with the manufacturer's approved lubricant; grease, oil and detergent damage the ring.

  • Bedding and embedment follow AS/NZS 3500.2 and AS 3725: a granular bed plus haunch and side support, not just support under the barrel.

  • Flexible pipes carry load through soil-structure interaction, so the quality of the side support and compaction matters more than the pipe alone.

  • Fittings and adaptors must match the pipe material and stiffness or pressure class, or be an approved transition fitting.

  • Above-ground pipework needs adequate supports, gradient and provision for thermal expansion, with materials suited to the location.

Quick reference

Installation of below-ground and above-ground drainage

  • Pipes are laid with sockets facing upstream so spigots enter downstream, and laying usually proceeds from the outlet upwards where access allows.

  • Invert levels and line are checked against laser or dumpy level readings at each structure and at maximum intervals along the run.

  • Inspection points are required at the foot of stacks, at changes of direction greater than 45 degrees, on long runs and near the boundary.

  • Horizontal drains use swept junctions and bends; sharp 90-degree bends are not acceptable in horizontal drainage.

  • Backfill is placed in even layers and compacted symmetrically on both sides of the pipe to control deflection and prevent lateral movement.

  • Thrust blocks or restrained joints are required at bends and tees on pressure mains before testing and commissioning.

  • Vent pipes terminate above roof level and away from openings to AS/NZS 3500.2 so foul air does not enter the building.

  • Drains maintain specified horizontal and vertical separation from water mains, power and gas services, with crossings shown on the drawings.

  • Rainwater downpipes discharge through a gully trap or charged connection to the stormwater system as detailed on the approved plans.

Quick reference

Testing, commissioning and inspection of drainage systems

  • Typical council inspection holds are pre-cover (before backfill), pre-line (before lining), and final, plus any conditions listed in the building consent.

  • A water test plugs the low end and fills the drain to the specified head, commonly at least 1.5 m above the highest point of the section under test, held for the prescribed period.

  • An air test applies low-pressure air to the sealed section and passes only if the pressure drop over the specified time is within the allowable limit.

  • Flexible pipe is checked after backfill with a mandrel or deflectometer to confirm deflection has not exceeded the permitted percentage.

  • CCTV inspection documents alignment, joint gaps, debris, root entry and infiltration; the record is retained and supplied with the completion documents.

  • Test certificates and records of work are signed by the licensed or certifying drainlayer and form part of the documentation for code compliance.

  • Before commissioning, lines are flushed and cleaned, every trap is confirmed to hold its seal, and venting is confirmed continuous to atmosphere.

  • Pumped systems are commissioned with float settings, alarms and duty/standby changeover tested and recorded.

Quick reference

Trade waste, on-site wastewater and special drainage systems

  • Trade waste consents set discharge limits for pH (commonly about 6-10), temperature, fats/oils/grease, suspended solids and heavy metals.

  • Grease interceptors are sized from fixture capacity and retention time, and require a documented maintenance and pump-out regime.

  • AS/NZS 1547 covers on-site domestic wastewater management, including treatment system selection, application area sizing and setbacks.

  • Effluent application areas are sized from soil category and hydraulic loading rate, with setbacks from bores, boundaries, waterways and buildings.

  • Septic tanks are two-compartment, retain sludge and scum, and need periodic desludging and inspection of baffles and outlets.

  • Secondary and aerated treatment systems need power, a servicing contract and council approval as a condition of consent.

  • Chemical or high-strength trade waste may need pre-treatment such as neutralising, settling or bunded storage before discharge.

  • Nothing from a trade waste, washdown or vehicle area may discharge to stormwater; only to sewer under consent or to an approved collection system.

  • Special systems include silt traps, petrol/oil interceptors, cooling tower bleed disposal and backflow prevention on the incoming supply.

Quick reference

Plan interpretation, documentation and certification

  • The plan view gives layout and offsets; the longitudinal section gives chainages, invert levels and grades between structures.

  • Depth of burial = surface level minus invert level, both taken from the same datum.

  • Grade is drawn as a ratio (1:60) or a percentage; convert with % = 100 / ratio denominator.

  • At 1:100 scale, 1 mm on the drawing equals 100 mm on the ground; always confirm the stated scale and do not scale off reduced copies.

  • The legend, north point, drawing number, revision and approval stamp identify the current consented version; superseded revisions must not be built from.

  • Completion documentation commonly includes as-built plans, test certificates, records of work, producer statements and maintenance information.

  • Any departure from the consented plans is recorded as a variation and referred back to the building consent authority where compliance is affected.

  • Consent conditions list the inspections and documents required before a code compliance certificate can be issued.

Quick reference

Supervision, health and safety, and contracting practice

  • Under the Health and Safety at Work Act 2015 a PCBU must eliminate risks so far as reasonably practicable, and must consult with workers on site hazards.

  • Excavations of 1.5 m or deeper require shoring, benching or battering, with a competent person's inspection before each shift and after rain.

  • Before excavation, service plans are obtained and interpreted, a locator is used, and hand digging is used near marked services.

  • Confined space entry requires a permit, atmospheric testing, a standby person outside, continuous monitoring and a rescue plan.

  • Notifiable events, including serious harm and dangerous incidents, are reported to WorkSafe New Zealand as soon as practicable.

  • Common contract forms are NZS 3910 for construction works and NZS 3915 for smaller building and drainage contracts.

  • A licensed drainlayer must supervise trainees and take responsibility for the work meeting standards and for the record of work issued.

  • Site records kept include the daily diary, delivery dockets, inspection sign-offs, test results and any approved variations.

  • Waste and spoil are managed and disposed of to approved facilities, with documentation retained for contaminated or hazardous material.