OH HVAC Contractor study materials
OH HVAC Contractor study resources

OH HVAC Contractor key terms

OH HVAC Contractor · Get comfortable with the vocabulary.

Manual J load calculation

A room-by-room method of estimating heating and cooling loads from envelope areas, insulation, windows, infiltration, and design temperatures. It sizes equipment correctly instead of relying on rules of thumb.

Related: Manual D duct design, design temperature
Manual D duct design

A procedure for sizing supply and return ducts using available static pressure, equivalent length, and friction rate so the blower delivers design airflow to each room.

Related: Manual J load calculation, external static pressure
design temperature

The outdoor winter and summer conditions a system is sized to handle, typically the 99 percent winter and 1 percent summer values for the location. Equipment capacity is matched to load at these points.

Related: Manual J load calculation, balance point
superheat

The number of degrees a refrigerant vapor is above its saturation temperature at a given pressure. Measured at the evaporator outlet, it confirms the expansion valve is feeding the coil properly.

Related: subcooling, TXV
subcooling

The number of degrees a liquid refrigerant is below its saturation temperature at a given pressure. Measured at the condenser outlet, it indicates how much liquid is stacked in the condenser.

Related: superheat, TXV
TXV

A thermostatic expansion valve that meters refrigerant into the evaporator and modulates flow to hold a set superheat. It responds to evaporator outlet temperature and pressure through a sensing bulb.

Related: superheat, subcooling
balance point

The outdoor temperature at which a heat pump's capacity exactly equals the building's heat loss. Below it, supplemental or backup heat must make up the difference.

Related: design temperature, auxiliary heat
auxiliary heat

Supplemental electric resistance or fossil-fuel heat that operates when a heat pump cannot meet the load, such as during defrost or below the balance point.

Related: balance point, defrost cycle
defrost cycle

A timed or demand-initiated sequence that reverses refrigerant flow or stops the outdoor fan to melt frost from an outdoor coil, often energizing auxiliary heat to prevent cold blow.

Related: auxiliary heat, balance point
external static pressure

The resistance to airflow measured across the blower assembly, expressed in inches of water column. It is used with the fan performance table to confirm the system is moving design airflow.

Related: Manual D duct design, airflow
airflow

The volume of air moved per unit time, usually cubic feet per minute. Correct airflow is required for capacity, efficiency, and safe combustion in fuel-burning equipment.

Related: external static pressure, combustion air
combustion air

Air supplied to a fuel-burning appliance for complete combustion and dilution of flue gases. It must be provided from outdoors or adequately sized openings per code.

Related: airflow, flue
flue

The passage or vent that carries products of combustion from an appliance to the outdoors. Correct sizing, slope, and termination prevent spillage of carbon monoxide into the building.

Related: combustion air, draft
draft

The negative pressure that draws combustion gases up a vent or chimney. It can be natural, from buoyancy of hot gases, or mechanical, from an induced-draft fan.

Related: flue, combustion air
refrigerant recovery

Removing refrigerant from a system into a recovery cylinder or machine rather than venting it to the atmosphere. Federal law requires recovery before opening a circuit.

Related: recovery cylinder, refrigerant
refrigerant

The working fluid in a refrigeration cycle that absorbs heat by evaporating at low pressure and rejects heat by condensing at high pressure. Handling is regulated by federal and state rules.

Related: refrigerant recovery, superheat
recovery cylinder

A DOT-approved, properly labeled vessel used to store recovered refrigerant. It must not be overfilled and must be evacuated before use.

Related: refrigerant recovery, refrigerant
water hammer

A banging noise and pressure surge caused by a sudden stop in water flow, such as a fast-closing valve. Arrestors or properly sized piping reduce the shock.

Related: backflow preventer, air gap
backflow preventer

A device that prevents contaminated water from reversing into a potable supply due to backsiphonage or backpressure. Selection depends on the degree of hazard.

Related: air gap, cross-connection
air gap

The vertical separation between a potable water outlet and the flood level rim of a receiving fixture. It is the most reliable form of backflow protection.

Related: backflow preventer, cross-connection
cross-connection

Any actual or potential link between a potable water system and a source of contamination or pollution. It must be eliminated or protected by an approved backflow device.

Related: backflow preventer, air gap
hydronic loop

A closed piping circuit that circulates heated or chilled water between a boiler or chiller and terminal units such as baseboard, radiators, or fan coils.

Related: circulator pump, expansion tank
circulator pump

A pump that moves water through a hydronic loop. It must be sized for the system's head loss and flow rate, and often uses a flanged or wet-rotor design.

Related: hydronic loop, expansion tank
expansion tank

A vessel that absorbs the volume change of water as it heats in a closed hydronic system, limiting pressure rise and protecting components from overpressure.

Related: hydronic loop, circulator pump
trap seal

The water held in a plumbing trap that blocks sewer gas from entering a building. Its depth is set by code and must be maintained by proper venting.

Related: vent stack, water hammer
vent stack

A vertical pipe that admits air to a drainage system and carries sewer gases to the outdoors, protecting trap seals from siphonage.

Related: trap seal, cross-connection
ground fault circuit interrupter

A device that trips when it detects a small current imbalance between hot and neutral, protecting people from shock. Required in many wet and outdoor locations.

Related: equipment grounding conductor, overcurrent protection
equipment grounding conductor

The conductor that connects non-current-carrying metal parts of equipment to the grounding system, providing a low-impedance path for fault current.

Related: ground fault circuit interrupter, bonding
bonding

Electrically connecting metal parts to ensure they remain at the same potential, preventing shock and arcing. It is distinct from grounding to earth.

Related: equipment grounding conductor, ground fault circuit interrupter
overcurrent protection

A fuse or circuit breaker that opens a circuit when current exceeds its rating, protecting conductors and equipment from overheating and fire.

Related: disconnect, ground fault circuit interrupter
disconnect

A switch or device that opens all ungrounded conductors to an appliance, allowing it to be safely serviced. It must be located within sight and be properly rated.

Related: overcurrent protection, lockout/tagout
lockout/tagout

A procedure that isolates and locks an energy source in the off position and tags it so equipment cannot be re-energized while someone is working on it.

Related: disconnect, overcurrent protection
ampacity

The maximum current a conductor can carry continuously under stated conditions without exceeding its temperature rating. It determines wire size and breaker selection.

Related: overcurrent protection, voltage drop
voltage drop

The loss of voltage along a conductor due to resistance, which increases with current and length. Excessive drop reduces motor performance and wastes energy.

Related: ampacity, overcurrent protection
Ohio Construction Industry Licensing Board

The state board within the Ohio Department of Commerce that licenses HVAC, refrigeration, plumbing, hydronics, and electrical contractors and enforces Chapter 4740 requirements.

Related: Ohio Revised Code Chapter 4740, contractor license
Ohio Revised Code Chapter 4740

The Ohio statute governing licensing of construction contractors, including HVAC, refrigeration, plumbing, hydronics, and electrical trades, and the board that administers it.

Related: Ohio Construction Industry Licensing Board, continuing education
contractor license

A credential issued by the board authorizing a person or business to perform or offer licensed trade work in Ohio. It is required before contracting and must be renewed.

Related: Ohio Construction Industry Licensing Board, continuing education
continuing education

Required hours of approved instruction a licensee must complete each renewal cycle to maintain licensure and stay current on code and trade practice.

Related: contractor license, Ohio Revised Code Chapter 4740
qualifying individual

The licensed person whose credential supports a contracting business entity's registration and who is responsible for the work performed under that license.

Related: contractor license, Ohio Construction Industry Licensing Board