Retainage

A percentage of each progress payment withheld by the owner until substantial completion or final acceptance, protecting the owner against defective or incomplete work and unpaid subcontractors.

Related: Substantial Completion, Lien Waiver
Substantial Completion

The stage when the work is sufficiently finished for its intended use, triggering start of warranty periods, retainage release, and the owner's right to occupy the project.

Related: Punch List, Retainage
Punch List

A written inventory of minor incomplete or defective items identified at substantial completion that the contractor must correct before final payment and closeout.

Related: Substantial Completion, Closeout Documents
Critical Path Method

A scheduling technique that identifies the longest sequence of dependent activities, showing which delays directly push out the project completion date.

Related: Float, Baseline Schedule
Float

The amount of time an activity can slip without delaying the project finish, calculated as the difference between late and early start or finish dates.

Related: Critical Path Method, Baseline Schedule
Change Order

A written, signed modification to the contract documents adjusting scope, price, or time, executed by the owner and contractor after agreement on cost and schedule impact.

Related: Constructive Change, Request for Information
Constructive Change

An unapproved change resulting from owner direction, defective plans, or differing site conditions that entitles the contractor to an equitable adjustment even without a formal change order.

Related: Change Order, Differing Site Conditions
Request for Information

A formal written query from the contractor asking the design professional to clarify or interpret ambiguous drawings or specifications, with responses becoming part of the contract record.

Related: Change Order, Addendum
Addendum

A written modification to bidding or contract documents issued before bid opening that clarifies, corrects, or supplements the drawings and specifications for all bidders.

Related: Request for Information, Bid Bond
Quantity Takeoff

The systematic measurement of materials and labor from drawings and specifications, organized by work item, forming the basis for pricing a construction estimate.

Related: Unit Price, Contingency
Contingency

A budgeted allowance added to an estimate to cover unknown costs, scope uncertainty, or risk, typically reduced as design and construction information become more definitive.

Related: Quantity Takeoff, Unit Price
Benchmark

A fixed reference point of known elevation or horizontal position from which site grades, building corners, and elevations are established and checked during construction.

Related: Cut and Fill, Spot Elevation
Cut and Fill

The process of excavating soil from high areas and placing it in low areas to achieve design grades, ideally balancing volumes on site to minimize hauling costs.

Related: Benchmark, Soil Compaction
Soil Compaction

Mechanical densification of soil by removing air voids, measured as a percentage of maximum dry density determined by a standard laboratory test such as Proctor.

Related: Cut and Fill, Liquidated Damages
Differing Site Conditions

Subsurface or physical conditions materially different from those indicated in the contract documents or unusually different from those normally encountered, entitling the contractor to an adjustment.

Related: Constructive Change, Change Order
Slump Test

A field test measuring concrete consistency by the vertical settlement of a molded cone, used with specified tolerances to verify workability before placement.

Related: Curing, Formwork
Curing

Maintaining adequate moisture and temperature in concrete after placement so cement hydration continues, developing specified strength and durability without premature drying or freezing.

Related: Slump Test, Formwork
Formwork

Temporary molds and supports that hold fresh concrete in shape and position until it gains sufficient strength, often designed for pressure and removal at specified times.

Related: Curing, Slump Test
Mortar Joint

The layer of mortar bonding masonry units, whose thickness, tooling, and type affect wall strength, water penetration resistance, and appearance.

Related: Flashing, Curing
Flashing

Impervious material installed at roof, wall, and opening intersections to direct water away from the building interior, including through-wall and counterflashing in masonry construction.

Related: Mortar Joint, Vapor Barrier
Vapor Barrier

A material with low permeance installed to limit moisture diffusion through building assemblies, typically placed on the warm side of insulation in cold climates.

Related: Flashing, Thermal Bridging
Thermal Bridging

A path of high-conductivity material through insulation, such as steel studs or concrete slabs, that reduces overall assembly R-value and can cause condensation.

Related: Vapor Barrier, R-Value
R-Value

A measure of thermal resistance per unit thickness of a material; higher values indicate better insulating performance, and assembly values combine layer resistances.

Related: Thermal Bridging
Moment Connection

A structural steel joint that restrains rotation, transferring bending moment and shear between members, typically using welded flanges or high-strength bolted plates.

Related: Shear Connection, High-Strength Bolt
Shear Connection

A steel joint designed to transfer vertical shear only while allowing rotation, commonly using simple bolted framing angles or seated connections.

Related: Moment Connection, High-Strength Bolt
High-Strength Bolt

A structural fastener installed to a specified tension, often by turn-of-nut or tension-calibrated methods, used in steel connections requiring slip resistance.

Related: Moment Connection, Shear Connection
BIM Coordination

Using a shared three-dimensional model to detect clashes among structural, mechanical, electrical, and plumbing systems before installation, reducing field conflicts and rework.

Related: Clash Detection, Shop Drawing
Clash Detection

Software analysis that identifies geometric conflicts between building systems or components in a coordinated model so they can be resolved before fabrication and installation.

Related: BIM Coordination, Shop Drawing
Shop Drawing

A contractor-prepared detail drawing showing fabrication and installation of a specific component, submitted to the design professional for review before manufacture or erection.

Related: BIM Coordination, Request for Information
Competent Person

An individual capable of identifying existing and predictable hazards and authorized to take prompt corrective measures, required for excavations, scaffolding, and other high-hazard tasks.

Related: Excavation Protective System, Fall Protection
Excavation Protective System

Sloping, benching, shoring, or shielding used in trenches five feet or deeper to protect workers from cave-ins, designed by a qualified person for soil conditions.

Related: Competent Person, Confined Space
Confined Space

A space with limited entry and exit that is not designed for continuous occupancy, requiring hazard evaluation and, for permit spaces, an entry program with atmospheric testing.

Related: Excavation Protective System, Competent Person
Fall Protection

Systems such as guardrails, personal fall arrest, or safety nets used to protect workers exposed to falls of six feet or more in construction, per OSHA requirements.

Related: Competent Person
Mechanic's Lien

A statutory claim filed against real property by a contractor, subcontractor, or supplier who furnished labor or materials and was not paid, securing payment through the property.

Related: Lien Waiver, Preliminary Notice
Preliminary Notice

A statutory notice, sometimes called a pre-lien notice, given by a potential claimant to the owner and general contractor early in the project to preserve lien rights.

Related: Mechanic's Lien, Lien Waiver
Lien Waiver

A written document in which a claimant relinquishes lien rights, either conditionally or unconditionally and for progress or final payment, in exchange for payment received.

Related: Mechanic's Lien, Retainage
Bid Bond

A surety instrument guaranteeing that a bidder will enter the contract and furnish required bonds if awarded, typically forfeiting a percentage of the bid if the bidder fails.

Related: Performance Bond, Addendum
Performance Bond

A surety bond guaranteeing the contractor will complete the work according to the contract, giving the owner a remedy if the contractor defaults.

Related: Bid Bond, Substantial Completion