OK General Contractor key terms
OK General Contractor · Get comfortable with the vocabulary.
- Retainage
- Related: Substantial Completion, Lien Waiver
A percentage of each progress payment withheld by the owner until substantial completion or final acceptance, protecting the owner against defective or incomplete work and unpaid subcontractors.
- Substantial Completion
- Related: Punch List, Retainage
The stage when the work is sufficiently finished for its intended use, triggering start of warranty periods, retainage release, and the owner's right to occupy the project.
- Punch List
- Related: Substantial Completion, Closeout Documents
A written inventory of minor incomplete or defective items identified at substantial completion that the contractor must correct before final payment and closeout.
- Critical Path Method
- Related: Float, Baseline Schedule
A scheduling technique that identifies the longest sequence of dependent activities, showing which delays directly push out the project completion date.
- Float
- Related: Critical Path Method, Baseline Schedule
The amount of time an activity can slip without delaying the project finish, calculated as the difference between late and early start or finish dates.
- Change Order
- Related: Constructive Change, Request for Information
A written, signed modification to the contract documents adjusting scope, price, or time, executed by the owner and contractor after agreement on cost and schedule impact.
- Constructive Change
- Related: Change Order, Differing Site Conditions
An unapproved change resulting from owner direction, defective plans, or differing site conditions that entitles the contractor to an equitable adjustment even without a formal change order.
- Request for Information
- Related: Change Order, Addendum
A formal written query from the contractor asking the design professional to clarify or interpret ambiguous drawings or specifications, with responses becoming part of the contract record.
- Addendum
- Related: Request for Information, Bid Bond
A written modification to bidding or contract documents issued before bid opening that clarifies, corrects, or supplements the drawings and specifications for all bidders.
- Quantity Takeoff
- Related: Unit Price, Contingency
The systematic measurement of materials and labor from drawings and specifications, organized by work item, forming the basis for pricing a construction estimate.
- Contingency
- Related: Quantity Takeoff, Unit Price
A budgeted allowance added to an estimate to cover unknown costs, scope uncertainty, or risk, typically reduced as design and construction information become more definitive.
- Benchmark
- Related: Cut and Fill, Spot Elevation
A fixed reference point of known elevation or horizontal position from which site grades, building corners, and elevations are established and checked during construction.
- Cut and Fill
- Related: Benchmark, Soil Compaction
The process of excavating soil from high areas and placing it in low areas to achieve design grades, ideally balancing volumes on site to minimize hauling costs.
- Soil Compaction
- Related: Cut and Fill, Liquidated Damages
Mechanical densification of soil by removing air voids, measured as a percentage of maximum dry density determined by a standard laboratory test such as Proctor.
- Differing Site Conditions
- Related: Constructive Change, Change Order
Subsurface or physical conditions materially different from those indicated in the contract documents or unusually different from those normally encountered, entitling the contractor to an adjustment.
- Slump Test
- Related: Curing, Formwork
A field test measuring concrete consistency by the vertical settlement of a molded cone, used with specified tolerances to verify workability before placement.
- Curing
- Related: Slump Test, Formwork
Maintaining adequate moisture and temperature in concrete after placement so cement hydration continues, developing specified strength and durability without premature drying or freezing.
- Formwork
- Related: Curing, Slump Test
Temporary molds and supports that hold fresh concrete in shape and position until it gains sufficient strength, often designed for pressure and removal at specified times.
- Mortar Joint
- Related: Flashing, Curing
The layer of mortar bonding masonry units, whose thickness, tooling, and type affect wall strength, water penetration resistance, and appearance.
- Flashing
- Related: Mortar Joint, Vapor Barrier
Impervious material installed at roof, wall, and opening intersections to direct water away from the building interior, including through-wall and counterflashing in masonry construction.
- Vapor Barrier
- Related: Flashing, Thermal Bridging
A material with low permeance installed to limit moisture diffusion through building assemblies, typically placed on the warm side of insulation in cold climates.
- Thermal Bridging
- Related: Vapor Barrier, R-Value
A path of high-conductivity material through insulation, such as steel studs or concrete slabs, that reduces overall assembly R-value and can cause condensation.
- R-Value
- Related: Thermal Bridging
A measure of thermal resistance per unit thickness of a material; higher values indicate better insulating performance, and assembly values combine layer resistances.
- Moment Connection
- Related: Shear Connection, High-Strength Bolt
A structural steel joint that restrains rotation, transferring bending moment and shear between members, typically using welded flanges or high-strength bolted plates.
- Shear Connection
- Related: Moment Connection, High-Strength Bolt
A steel joint designed to transfer vertical shear only while allowing rotation, commonly using simple bolted framing angles or seated connections.
- High-Strength Bolt
- Related: Moment Connection, Shear Connection
A structural fastener installed to a specified tension, often by turn-of-nut or tension-calibrated methods, used in steel connections requiring slip resistance.
- BIM Coordination
- Related: Clash Detection, Shop Drawing
Using a shared three-dimensional model to detect clashes among structural, mechanical, electrical, and plumbing systems before installation, reducing field conflicts and rework.
- Clash Detection
- Related: BIM Coordination, Shop Drawing
Software analysis that identifies geometric conflicts between building systems or components in a coordinated model so they can be resolved before fabrication and installation.
- Shop Drawing
- Related: BIM Coordination, Request for Information
A contractor-prepared detail drawing showing fabrication and installation of a specific component, submitted to the design professional for review before manufacture or erection.
- Competent Person
- Related: Excavation Protective System, Fall Protection
An individual capable of identifying existing and predictable hazards and authorized to take prompt corrective measures, required for excavations, scaffolding, and other high-hazard tasks.
- Excavation Protective System
- Related: Competent Person, Confined Space
Sloping, benching, shoring, or shielding used in trenches five feet or deeper to protect workers from cave-ins, designed by a qualified person for soil conditions.
- Confined Space
- Related: Excavation Protective System, Competent Person
A space with limited entry and exit that is not designed for continuous occupancy, requiring hazard evaluation and, for permit spaces, an entry program with atmospheric testing.
- Fall Protection
- Related: Competent Person
Systems such as guardrails, personal fall arrest, or safety nets used to protect workers exposed to falls of six feet or more in construction, per OSHA requirements.
- Mechanic's Lien
- Related: Lien Waiver, Preliminary Notice
A statutory claim filed against real property by a contractor, subcontractor, or supplier who furnished labor or materials and was not paid, securing payment through the property.
- Preliminary Notice
- Related: Mechanic's Lien, Lien Waiver
A statutory notice, sometimes called a pre-lien notice, given by a potential claimant to the owner and general contractor early in the project to preserve lien rights.
- Lien Waiver
- Related: Mechanic's Lien, Retainage
A written document in which a claimant relinquishes lien rights, either conditionally or unconditionally and for progress or final payment, in exchange for payment received.
- Bid Bond
- Related: Performance Bond, Addendum
A surety instrument guaranteeing that a bidder will enter the contract and furnish required bonds if awarded, typically forfeiting a percentage of the bid if the bidder fails.
- Performance Bond
- Related: Bid Bond, Substantial Completion
A surety bond guaranteeing the contractor will complete the work according to the contract, giving the owner a remedy if the contractor defaults.