OK General Contractor: Mechanical, Electrical, and Plumbing Coordination

OK General Contractor · Work through your exam, one topic at a time.

All guide sections

Mechanical, Electrical, and Plumbing Coordination

What is tested

MEP coordination tests how the trades fit together: sleeves, clearances, slopes, access, testing, and commissioning. Questions often involve code clearances and interference.

Core rules

  • Coordinate before installation: combine plumbing, HVAC, electrical, and fire protection in a clash-detection model; resolve ceiling and structural conflicts.
  • Plumbing: drain lines slope toward the drain; a common rule is ¼ in per ft for 2 in and smaller and ⅛ in per ft for larger. Vents protect traps.
  • Electrical: working space in front of panels is typically 30 in wide, 36 in deep, and 6½ ft high; do not block panels.
  • HVAC: ducts need clearance and access; fire dampers are required at rated assemblies; condensate drains must slope.
  • Access panels are required for concealed valves, dampers, and equipment. Test and balance, pressure tests, and commissioning verify performance.

Worked example

A 20 ft drain run at ¼ in per ft falls 20 × 0.25 = 5 in. If the upstream invert is 100.00 ft, the downstream invert is 99.583 ft because 5 in = 0.417 ft. Reasoning: convert inches to feet before subtracting; slope is drop per horizontal foot, not per pipe length along the slope.

Traps

Running drains flat; burying valves without access; sizing electrical working space from the panel door only; ignoring firestopping at rated walls; coordinating after rough-in.