Phius Certified Passive House Consultant (CPHC) study materials
Phius Certified Passive House Consultant (CPHC) study resources

Phius Certified Passive House Consultant (CPHC) cheat sheet

Phius Certified Passive House Consultant (CPHC) · Keep the key ideas within reach.

Quick reference

Passive Building Principles

  • Passive House targets a space-conditioning demand so low that a conventional heating/cooling distribution system becomes unnecessary; the classic metric pairs ~15 kWh/(m²·yr) heating and cooling demand with a peak load near 10 W/m².

  • The three pillars are a continuous, airtight, thermally bridge-free envelope; minimized internal and solar gains managed by orientation and shading; and balanced mechanical ventilation with heat recovery for fresh air.

  • Specific space heat demand qH = QH / A_ref, where A_ref is the treated floor area (TFA), not gross floor area; every demand metric in Phius work is normalized to TFA.

  • Peak heating load is governed by transmission through the envelope plus ventilation losses minus internal gains at design conditions; a low peak load is what allows omitting a central heating plant.

  • Thermal bridges are quantified by a linear thermal transmittance ψ [W/(m·K)]; the junction penalty is ψ·L added to the UA of the assembly.

  • Internal heat gains are typically modeled at roughly 2.1 W/m² of TFA for residential occupancy; overestimating gains lowers predicted demand on paper but risks real underheating.

  • Superinsulation shifts the annual balance so that overheating risk and cooling demand often dominate design decisions in temperate and warm climates; shading and night flush become primary strategies.

  • Airtightness is expressed as n50, the air change rate at 50 Pa, or as q50 per envelope area; passive targets are typically n50 ≤ 0.6 h⁻¹ for the whole building.

Quick reference

Building Enclosure Design

  • UA of an assembly = Σ (A_i / R_i) + Σ (ψ_j · L_j) + Σ (χ_k); reduce UA by raising R and by eliminating repeated junctions, not by adding insulation in one place.

  • Continuous exterior insulation keeps the structural layer warm, raises the dew point outside the sheathing, and reduces thermal bridging at studs, slabs, and rim joists.

  • Rigid insulation must be thick enough to keep the condensing surface above the interior dew point; the ratio of exterior to cavity R needed depends on climate and cladding permeance.

  • Windows dominate losses: use whole-window U-values (frame plus spacer plus glazing), not center-of-glass; a good passive window is roughly U ≤ 0.80 W/(m²·K) with a high solar heat gain coefficient for heating climates.

  • The glazing-to-frame ratio and spacer type drive edge-of-glass temperatures; cold edge temperatures cause condensation and comfort complaints even when the center-of-glass U is excellent.

  • Airtightness layers must be continuous and on the warm side or protected by a vapor-permeable, airtight membrane; penetrations for ducts, wires, and pipes are the usual leak paths.

  • Vapor control is climate-specific: in cold climates place a vapor retarder on the warm side; in mixed and warm-humid climates use vapor-open assemblies and control inward vapor drive from cladding.

  • Roof and slab junctions are the highest-frequency thermal bridges; a cantilevered balcony or a slab-on-grade edge can each add several W/(m·K) if left unmitigated.

Quick reference

Whole-Building Energy Modeling (WUFI Passive)

  • WUFI Passive couples a hygrothermal assembly model with a whole-building energy balance; envelope assemblies are built from layers with material properties, then referenced by area in the building model.

  • Model geometry is defined by zones with conditioned, unconditioned, and adjacent classifications; only conditioned TFA enters the demand metrics, so zone boundaries must be drawn deliberately.

  • The certification metrics are annual specific demand (kWh or kWh/(m²·yr)) plus peak load (W or W/m²); both must pass, so a design can fail on peak load alone.

  • Ventilation is modeled as a balanced system with a heat recovery efficiency and a frost-protection strategy; the recovered heat is credited in the space-conditioning balance.

  • Shading is modeled with horizon and overhang objects; the solar gain through a window is reduced by the shading factor and by the glazing g-value (SHGC), not by orientation alone.

  • Thermal bridge values are entered as ψ per junction length or as a point χ; unentered junctions default to uncorrected and will overstate or understate performance depending on the default.

  • Model results must be sanity-checked: compare predicted specific demand against the assembly U-values and the glazing area; a very low result usually means an unmodeled zone or a wrong area.

  • The model is the certification artifact; the as-built building must match the modeled envelope, ventilation, and systems, and deviations require a documented update.

Quick reference

Mechanical Systems and Ventilation

  • Balanced ventilation supplies and exhausts equal air volumes; an unbalanced system drives pressure differences that push moist air into assemblies and increases infiltration losses.

  • Heat recovery efficiency (sensible, and total where an enthalpy core is used) directly reduces ventilation heat loss; a recovery of ~75-85% is typical for certified units.

  • Ventilation airflow is sized from occupancy or floor area; a common residential basis is roughly 30 m³/(h·person) or a per-area rate, and the design rate must be documented.

  • Frost protection strategies include a preheater, a recirculating defrost damper, or supply-air tempering; the chosen strategy must be represented in the energy model.

  • Ducts inside the conditioned envelope avoid losing recovered heat; ducts in unconditioned attics or garages negate much of the recovery benefit and must be insulated and sealed.

  • A post-heater is permitted but its energy counts against the demand metrics; the design intent is that ventilation air alone, tempered by recovery, meets most of the load.

  • Domestic hot water is a major remaining load in passive buildings; drain-water heat recovery and compact units with distribution inside the envelope reduce it.

  • Cooking and bathroom exhaust must be interlocked with or balanced against the HRV/ERV so that the building does not depressurize and pull humid air into the envelope.

Quick reference

Phius Standards and Certification

  • Phius certification has multiple tiers; the core passive requirement is a very low specific space-conditioning demand plus a peak load low enough to omit a conventional distribution system.

  • Phius standards are climate-specific: the source energy and demand limits are set by climate zone, so a design that passes in one location may fail in another.

  • Source energy limits account for the efficiency of the grid and of on-site generation; all-electric designs and heat pumps are favored over fossil combustion.

  • Renewable energy can be credited against the source energy limit; the credit depends on the renewable type and whether it is on-site or off-site.

  • The Phius certification process requires a certified consultant, a submitted energy model, and third-party quality assurance; the certificate is issued to the building, not the designer.

  • Prescriptive and performance paths exist; the performance path uses the WUFI Passive model, while prescriptive paths constrain assemblies and systems directly.

  • Airtightness and ventilation commissioning are verified on site; a passing model without verified airtightness does not yield certification.

  • Recertification and continuing education keep the consultant credential current; lapsed credentials cannot submit projects.

Quick reference

Quality Assurance and Verification

  • Blower-door testing measures n50 at 50 Pa; the result is extrapolated to natural conditions with an n-factor, so the reported natural infiltration is always lower than n50.

  • The airtightness test must be done after the air barrier is complete but before finishes conceal it; a failed test at that stage is still fixable.

  • Thermal imaging during a blower-door test reveals missing insulation and air leaks; a temperature difference of at least ~10 K between inside and outside is needed for useful images.

  • Ventilation commissioning verifies design airflow at each terminal, the balance between supply and exhaust, and the measured heat recovery efficiency.

  • A quality-assurance checklist tracks envelope continuity, window installation, penetration sealing, and system commissioning; each item is signed off by the responsible trade.

  • Documentation includes the as-built model, test reports, commissioning records, and photographs of concealed air-barrier and insulation work.

  • Common failures are unsealed penetrations, discontinuous air barriers at floor and wall junctions, and ducts outside the envelope; each is caught by inspection before drywall.

  • The QA reviewer is independent of the design team; the reviewer's role is to confirm that the built building matches the certified model.