Phius Certified Passive House Consultant (CPHC) · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Passive Building Principles

  • Explain the passive building principles: solar gain, internal gains, thermal bridging, airtightness, and balanced ventilation.

  • Calculate heating and cooling loads for a simple single-zone building using the Phius peak load method.

  • Identify the differences between passive house, net-zero, and low-energy buildings.

  • List the five key envelope metrics: U-values, thermal bridges, airtightness, windows, and ventilation.

Your checkpoint

A one-page summary sheet with the five principles, a sample load calculation, and a comparison table of building standards.

Week 2

Passive Building Principles & Building Enclosure Design

  • Apply the Phius limit curves for opaque envelope U-values based on climate zone.

  • Evaluate thermal bridge penalties using the Phius thermal bridge methodology.

  • Select appropriate window specifications (U-value, SHGC) for a given climate.

  • Design an airtightness strategy including membrane placement and penetration sealing.

Your checkpoint

A case-study envelope design for a 150 m² single-family home in a cold climate, including assembly U-values, window schedule, and airtightness details.

Week 3

Building Enclosure Design

  • Analyze moisture risks in wall and roof assemblies using WUFI 1D or equivalent.

  • Design a vented vs. unvented roof assembly for a cold climate.

  • Specify foundation insulation and slab-edge details to minimize thermal bridging.

  • Compare three window frame types for thermal performance and cost.

Your checkpoint

A moisture analysis report for a double-stud wall and a roof assembly, with graphs of moisture content over two years and recommendations.

Week 4

Building Enclosure Design & Whole-Building Energy Modeling (WUFI Passive)

  • Set up a whole-building energy model in WUFI Passive for a simple rectangular building.

  • Input envelope assemblies, windows, and thermal bridges accurately into the model.

  • Run a baseline simulation and extract annual heating demand, cooling demand, and peak loads.

  • Identify the top three contributors to heating demand in the model.

Your checkpoint

A complete WUFI Passive model file and a summary report of baseline energy metrics with a sensitivity analysis of envelope parameters.

Week 5

Whole-Building Energy Modeling (WUFI Passive)

  • Model mechanical ventilation with heat recovery, including duct layout and fan power.

  • Incorporate internal gains and solar gains with correct schedules.

  • Calibrate the model against a provided benchmark building or utility data.

  • Use WUFI Passive to evaluate the impact of window shading and orientation.

Your checkpoint

A revised model incorporating HVAC and gains, with a comparison table of energy demand before and after optimization.

Week 6

Whole-Building Energy Modeling (WUFI Passive) & Mechanical Systems and Ventilation

  • Size a balanced ventilation system with heat recovery for a passive house.

  • Select ductwork and design a layout to minimize pressure drops.

  • Model a mini-split heat pump and domestic hot water system in WUFI Passive.

  • Verify compliance with Phius ventilation requirements (e.g., 0.3 ACH50).

Your checkpoint

A mechanical system design package including ventilation schematic, equipment selection, and WUFI Passive simulation results showing compliance with Phius limits.

Week 7

Mechanical Systems and Ventilation & Phius Standards, Certification, and Quality Assurance

  • Explain the Phius certification process from pre-certification to final certification.

  • Identify the roles of the rater, verifier, and consultant in quality assurance.

  • List the documentation required for Phius certification and common pitfalls.

  • Describe the on-site verification tests: blower door, duct blaster, and commissioning.

Your checkpoint

A certification roadmap for a project, including a checklist of required documents and a timeline with QA milestones.

Week 8

Phius Standards, Certification, and Quality Assurance & Passive Building Principles & Building Enclosure Design & Whole-Building Energy Modeling (WUFI Passive) & Mechanical Systems and Ventilation

  • Review all domains using practice questions and identify weak areas.

  • Complete a full-length practice exam under timed conditions.

  • Revisit key calculations: peak load, U-value, thermal bridge, and energy demand.

  • Summarize the Phius standards and limits in a quick-reference sheet.

Your checkpoint

A practice exam score report with a study plan for remaining gaps, plus a one-page quick-reference sheet of all key formulas and standards.

Milestones

Week 4: Complete a baseline WUFI Passive model and achieve a heating demand within 20% of the Phius limit for a cold climate.

Week 6: Design a ventilation system that meets Phius requirements and simulate it in WUFI Passive with results within 10% of the target.

Week 8: Score at least 80% on a timed practice exam covering all domains.