LEW study materials
LEW study resources

LEW: Testing, Inspection, and Troubleshooting

LEW · Work through your exam, one topic at a time.

All guide sections

Testing, Inspection, and Troubleshooting

What this domain tests

The order and method of inspection and testing, instrument use, interpretation of results, and the diagnostic reasoning used to locate faults.

Core rules

  • Sequence: visual inspection first, then continuity of protective and bonding conductors, ring final circuit continuity, insulation resistance, polarity, earth fault loop impedance, prospective fault current, RCD operation and functional testing.
  • Insulation resistance: 500 V DC, minimum 1 MΩ for a 400/230 V circuit, measured between live conductors and between live conductors and earth, with electronics, SPDs and dimmers disconnected.
  • RCD: trip within 300 ms at rated residual current and within 40 ms at 5 × IΔn; test both half-cycles where the instrument allows.
  • Test instruments must comply with GS38: fused or fused-probe leads and finger guards, with a proving unit for the voltage indicator.
  • Certification: an Electrical Installation Certificate for new work and a Minor Works Certificate for small alterations, both with schedules of test results.

Worked example

A lighting circuit gives 2.5 MΩ insulation resistance. It passes the 1 MΩ minimum, but if similar circuits on the board read 100 MΩ this outlier points to moisture, cable damage or a shared neutral. Record the value, then investigate the outlier rather than passing the whole board on one number.

Traps

  • Insulation testing with SPDs or electronic drivers still connected, giving false lows or damage.
  • Measuring Z_e with main bonding connected, so parallel paths give a misleadingly low value.
  • Confusing prospective fault current with earth fault loop current.
  • Certifying an installation without completing the schedule of test results.