SAP S/4HANA MM study materials
SAP S/4HANA MM study resources

SAP S/4HANA MM case studies

SAP S/4HANA MM · Put your knowledge to work in context.

The SAP S/4HANA Materials Management certification is a SAP credential aimed at professionals who configure and run procurement, inventory, and invoice-verification processes in SAP S/4HANA. Candidates are typically consultants, key users, or application specialists who already work with purchasing master data, goods movements, logistics invoice verification, and material valuation, and who want formal recognition of that configuration knowledge. The SAP S/4HANA MM case studies are 5 cases and about 3,635 words.

1

The release strategy that never fired

Nordwind Components releases purchase requisitions with a release procedure using classification (release group 01, strategy 02) built on characteristics plant (WERKS) and material group (MATKL). Thresholds: net value below 5,000 EUR needs no approval, 5,000 to 25,000 EUR one approval, above 25,000 EUR two approvals.

751 words, about 4 min
2

Count on 31 December, movements in January

On 31 December the warehouse counted material 4711 in storage location 0001 at 480 PC. The physical inventory document was created the same day with count date 31 December, but the counter entered the result only on 4 January.

602 words, about 3 min
3

Price variance, payment block R, and the clerk with a workaround

Purchase order 4500012345 covers 100 PC of material 4711 at 100.00 EUR, plant 1010, no account assignment, goods-receipt-based invoice verification not flagged. The goods receipt for 100 PC has been posted.

832 words, about 4 min
4

Account determination: GBB error and an asset receipt that touched nothing

Material 4712 (material type HALB) has valuation class 3000, standard price, plant 1010, company code 1000. A planner posts a goods issue of 50 PC to cost center 4110 with movement type 201.

626 words, about 3 min
5

Quota arrangement ignored, subcontracting receipt short of components

Material 5001 has two approved suppliers in plant 1010: V-100 with quota 60 and V-200 with quota 40, both quota arrangements valid today. A planning run created ten purchase requisitions, all for V-100.

824 words, about 4 min