TN General Contractor flashcards
TN General Contractor · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Current ratio
- Current assets divided by current liabilities. It measures whether short-term assets can cover short-term obligations, and a value below 1.0 signals possible liquidity problems.
- Working capital
- Current assets minus current liabilities. Positive working capital indicates the firm can fund day-to-day operations; negative working capital means it relies on credit to operate.
- Markup versus margin
- Markup is a percentage added to cost, while margin is a percentage of the selling price. Selling price equals cost divided by one minus the target margin.
- Percentage of completion method
- An accounting method that recognizes revenue and gross profit in proportion to costs incurred to date divided by total estimated costs, used for long-term construction contracts.
- Constructive change
- Work the owner directs orally or implies through conduct that falls outside contract scope but is never formalized in a change order; it may still be compensable.
- Pay-if-paid clause
- Contract language making the owner's payment to the prime contractor a condition precedent to paying the subcontractor, shifting the risk of owner nonpayment to the subcontractor.
- Substantial completion
- The stage at which work is sufficiently complete for its intended use, triggering warranty start, occupancy rights, retainage release rights, and claim limitation periods.
- Differing site conditions
- Subsurface or latent physical conditions materially different from the contract documents, or unknown physical conditions of an unusual nature, entitling the contractor to an adjustment.
- Qualifying agent
- The individual who passes the licensing examinations and is designated to qualify a contracting entity before the Tennessee Board; the license depends on maintaining that qualifier.
- Tennessee licensing threshold
- A Tennessee contractor license is required for projects of $25,000 or more in total cost, while projects from $3,000 to $24,999 require a home improvement license.
- Monetary limit
- The maximum single-project dollar value a licensed contractor is authorized to perform; bidding or contracting above that limit violates Board rules and can bring penalties.
- Mechanic's lien
- A statutory claim recorded against real property by a party that furnished labor or materials, giving that party a security interest in the improved property until it is paid.
- Miller Act payment bond
- Federal law requiring payment and performance bonds on federal construction contracts over $150,000, protecting subcontractors and suppliers who cannot lien government property.
- Conditional versus unconditional waiver
- A conditional lien waiver becomes effective only when the stated payment actually clears; an unconditional waiver is effective on signing regardless of whether payment is received.
- Notice to surety
- Under the Miller Act a claimant must give written notice to the surety within 90 days after last furnishing labor or materials, then file suit within one year.
- Competent person
- An OSHA-defined individual who can identify existing and predictable hazards and is authorized to take prompt corrective action; required for excavation, scaffold, and fall-protection inspections.
- Fall protection trigger height
- OSHA construction standards require fall protection at 6 feet or more above a lower level, and for employees working in excavations 6 feet deep or more.
- Excavation protective system
- Trenches 5 feet deep or more require sloping, shoring, shielding, or benching; excavations 20 feet or deeper require a protective system designed by a registered professional engineer.
- Total float
- The time an activity can be delayed without delaying project completion; calculated as late start minus early start, or late finish minus early finish.
- Critical path
- The longest-duration chain of dependent activities through a schedule network. It has zero total float and determines the shortest possible project duration.
- Bid bond
- A bond submitted with a bid, typically 5 to 10 percent of the bid amount, guaranteeing the bidder will sign the contract and furnish required bonds if awarded the work.
- Addendum
- A written modification to bidding documents issued before bid opening. Bidders must acknowledge each addendum in their bid, and it becomes part of the contract.
- Standard Proctor test
- A laboratory test finding the maximum dry density and optimum moisture content of soil; field compaction is normally specified as a percentage of that maximum density.
- Soil swell factor
- The percentage volume increase when soil is excavated and loosened; used to convert bank cubic yards into loose cubic yards for hauling and truck counts.
- Frost line footing depth
- The depth to which groundwater freezes in winter. Footings must bear below this depth to prevent frost heave, and local codes set the required depth.
- Slump test
- ASTM C143 field test measuring concrete consistency by the settlement of a standard cone sample; a higher slump indicates a wetter, more workable mix.
- Water-cement ratio
- The weight of water divided by the weight of cementitious material in a mix. Lower ratios raise strength and durability but reduce workability.
- Type S mortar
- A cement-lime mortar with high bond strength and moderate compressive strength, commonly specified for masonry below grade and for structural unreinforced walls.
- Ice dam membrane
- A self-adhering waterproof underlayment installed at eaves and valleys under roofing to stop water backup from ice dams; required by code where ice damming occurs.
- Minimum shingle slope
- Asphalt shingles generally require a roof slope of at least 2:12 with double underlayment; slopes below that require a different roofing system.
- Vapor retarder location
- In cold climates the vapor retarder is placed on the warm interior side of the insulation; installing it on the cold side can trap moisture within the assembly.
- Punch list
- A list of incomplete or defective items compiled near the end of a project; the items must be corrected before final payment and release of retainage.