TN General Contractor · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Contract Law and Contract Administration

  • Identify the required elements of a valid construction contract and the point at which each becomes binding

  • Distinguish the roles, risks, and payment mechanics of design-bid-build, design-build, and construction-manager delivery methods

  • Interpret common contract clauses covering changes, differing site conditions, delay, suspension, and termination

  • Sequence the notice-and-claim steps a contractor must follow to preserve time and cost entitlements

Your checkpoint

One-page claim-and-notice timeline flowchart plus a 25-question self-quiz scoring at least 80%

Week 2

Business Organization, Financial Management, and Accounting & Contract Law and Contract Administration

  • Compare sole proprietorship, partnership, LLC, and corporation on liability exposure, taxation, and continuity

  • Read a balance sheet and income statement and compute the ratios that signal liquidity and solvency trouble

  • Build a job cost breakdown that separates direct cost, overhead, and markup, then recalculate a bid after a labor-rate change

  • Explain how retainage, progress billings, and change orders flow through job cost records

  • Draft a written response to a breach or default scenario citing the governing contract clause

Your checkpoint

A worked financial worksheet with ratios computed on sample statements plus a two-page entity comparison table

Week 3

Tennessee Contractor Licensing Law and Board Rules & Estimating, Bidding, and Project Scheduling

  • Summarize Tennessee licensing thresholds, license classifications, and the penalties for contracting without a valid license

  • Outline board procedures for license application, renewal, continuing education, and complaint handling

  • Perform a quantity takeoff for excavation, concrete, and formwork from written dimensions

  • Assemble a bid with labor, material, equipment, and indirect costs, then compare it against a computed break-even price

  • Produce a critical-path network and identify float, critical activities, and the schedule impact of a two-week weather delay

Your checkpoint

A complete sample estimate and a one-page activity-on-node schedule with critical path and float values labeled

Week 4

Employment Law, Labor Relations, and Jobsite Safety & Liens, Payment Bonds, and Payment Provisions

  • Apply lien filing, notice, and foreclosure timing rules to a fact pattern with a subcontractor and an owner

  • Explain how payment bonds and performance bonds are triggered and what a claimant must document

  • Identify the OSHA recordkeeping, fall protection, and hazard-communication obligations that apply to a residential-to-commercial contractor

  • Distinguish employee from independent contractor and apply wage-and-hour and workers' compensation rules to a crew situation

Your checkpoint

A timed 40-question mixed exam on liens, bonds, and safety, with a written correction log for every missed item

Week 5

Site Work, Excavation, and Foundations & Concrete, Masonry, and Structural Steel

  • Calculate cut and fill quantities and select the right compaction test for a given soil description

  • Sequence footing, foundation wall, and waterproofing operations and name the inspection holds between them

  • Specify concrete mix parameters, curing methods, and testing frequency for a given structural element

  • Compare masonry reinforcement, flashing, and grouting requirements against structural steel connection and fireproofing requirements

  • Diagnose three common field defects and state the corrective action for each

Your checkpoint

A defect-diagnosis sheet covering eight sitework, concrete, masonry, or steel failures with cause and remedy columns

Week 6

Carpentry, Roofing, and Building Envelope

  • Detail the flashing, underlayment, and ventilation layers of a sloped roof assembly and the failure modes of each

  • Explain the control layers of a wall assembly and where the air, vapor, and water barriers belong in a given climate

  • Identify framing connections and sheathing requirements that affect structural and wind resistance

  • Trace the water path in three common envelope leak scenarios and name the repair

Your checkpoint

Three hand-sketched wall and roof assemblies with every control layer labeled and an air/vapor barrier justification paragraph

Week 7

Project Management, Quality Control, and Project Closeout & Business Organization, Financial Management, and Accounting

  • Build a project closeout checklist covering punch list, substantial completion, final lien waivers, as-builts, and warranty turnover

  • Set up a quality-control inspection log with hold points and documentation standards

  • Re-test the two lowest-scoring domains from earlier weeks and log the reason for each remaining error

  • Recalculate overhead allocation and cash flow for a project that is 60% complete with a pending change order

Your checkpoint

A closeout checklist and quality-control log template plus a ranked list of your five weakest topics with a targeted review action for each

Week 8

Contract Law and Contract Administration & Tennessee Contractor Licensing Law and Board Rules & Estimating, Bidding, and Project Scheduling

  • Complete two full-length timed practice exams under test-day conditions

  • Review every missed question and group errors by root cause: knowledge gap, misread, or calculation slip

  • Recite from memory the licensing, lien, and contract-notice deadlines most likely to be tested

  • Re-drill calculation types, including markup versus margin, quantity takeoff, and schedule float

Your checkpoint

Two scored practice exams with a final one-page error analysis and a pre-test review card set

Milestones

Week 2: Score 80% or better on a self-written 25-question contract and financial-management quiz and explain each contract clause without notes

Week 4: Complete the timed 40-question mixed exam on liens, bonds, and safety and log a correction for every missed question

Week 6: Describe the full building-envelope control-layer stack and the foundation-to-roof construction sequence from memory in under ten minutes

Week 8: Average 85% or higher across two full-length timed practice exams with no domain below 70%