32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Critical path
The longest-duration chain of dependent activities in a project network. It sets the shortest possible project duration and contains activities with zero total float.
Total float formula
Total float equals late finish minus early finish, or late start minus early start. An activity with zero total float lies on the critical path.
Cost Performance Index
Cost Performance Index equals earned value divided by actual cost. A result below 1.0 means the project has spent more money than the completed work is worth.
Schedule Performance Index
Schedule Performance Index equals earned value divided by planned value. A result below 1.0 means less work has been completed than was planned for that point in time.
Utah licensing dollar threshold
Utah requires a contractor license from the Division of Professional Licensing for construction projects totaling $3,000 or more in labor and materials.
Qualifying party
The individual who passes the licensing exam and meets experience requirements, and who is an owner, officer, or employee responsible for the licensee's construction work.
Retainage
A percentage of each progress payment withheld by the owner until substantial or final completion, held as security for full performance and correction of deficiencies.
Substantial completion
The stage at which work is sufficiently complete that the owner can occupy and use it for its intended purpose, starting warranty and retainage release clocks.
Utah mechanics lien deadline
A lien claimant in Utah must record a Notice of Lien within 90 days after last furnishing labor, materials, or equipment to the project.
Lien enforcement deadline
In Utah a recorded lien must be enforced by filing suit within 180 days after the Notice of Lien is recorded, or the lien expires.
Preliminary notice in Utah
A written notice that a subcontractor or supplier must give within 20 days after first furnishing work in order to preserve lien rights on most Utah projects.
Pay-if-paid clause
A subcontract term making the owner's payment to the prime contractor a condition precedent to the subcontractor's right to payment, shifting nonpayment risk downward.
Flow-down clause
Contract language carrying the prime contract's duties, rights, and risk allocations down to subcontractors, including notice, indemnity, and dispute resolution provisions.
Type I differing site condition
A subsurface or latent physical condition at the site that materially differs from what the contract documents indicated, entitling the contractor to an equitable adjustment.
Constructive change
An owner action or inaction, such as defective specifications or unreasonable inspection, that is not a formal change order but has the same cost or time effect.
Utah written contract limitations
Utah's statute of limitations for breach of a written contract is six years from the date the claim accrues; oral contracts carry a four-year limit.
Utah public bid bond
A bid bond submitted with a bid on a Utah public works project is typically 5 percent of the total bid amount.
Performance bond amount
Performance and payment bonds on public construction projects are usually written for 100 percent of the contract price.
Unit price governs
When a bid's unit price conflicts with the extended total, the unit price controls and the extension is corrected in most standard bidding documents.
Addendum
A written modification to the bidding documents issued before bid opening. Bidders must acknowledge receipt, and failure to do so can make a bid nonresponsive.
Labor burden
The percentage added to base wages to cover payroll taxes, workers' compensation, insurance, and benefits, commonly 25 to 40 percent of the wage.
Contingency
A budget allowance set aside for unknown conditions and scope growth, typically 5 to 10 percent of the base estimate and reduced as the project advances.
Unbalanced bid
A bid whose unit prices are adjusted above or below the normal cost distribution, often front-loaded to improve the contractor's early cash flow.
Cubic yard volume formula
Cubic yards equal length times width times depth, all measured in feet, divided by 27, the number of cubic feet in one cubic yard.
Fall protection trigger height
OSHA requires fall protection for construction workers exposed to falls of 6 feet or more above a lower level.
Excavation protective system
A protective system such as sloping, shoring, or shielding is required for excavations 5 feet or deeper unless a competent person determines there is no hazard.
Competent person
A person who can identify existing and predictable hazards in the surroundings or working conditions and has authority to take prompt corrective measures to eliminate them.
Spoil pile setback
Excavated material, equipment, and other objects must be kept at least 2 feet back from the edge of an excavation.
Trench egress spacing
Trenches 4 feet or deeper must have a ladder, stairway, or ramp placed so workers travel no more than 25 feet laterally to reach it.
Crane power line clearance
Cranes must maintain at least 10 feet of clearance from power lines rated up to 50 kV, plus additional distance for higher voltages.
Fatality reporting time
An employer must report a work-related fatality to OSHA within 8 hours after learning of it.
Guardrail height
Scaffold and elevated platform guardrails must have a top rail between 38 and 45 inches above the platform surface.