UT General Contractor key terms
UT General Contractor · Get comfortable with the vocabulary.
- Critical Path Method (CPM)
- Related: Earned Value Management, Substantial Completion
A scheduling technique that identifies the longest sequence of dependent tasks in a project, showing which activities cannot be delayed without extending the overall completion date.
- Schedule of Values
- Related: Retainage, Substantial Completion
A project accounting document that breaks the contract price into work items with assigned values, used to review and approve progress payments based on completed work.
- Substantial Completion
- Related: Punch List, Retainage
The stage when the work is sufficiently complete for the owner to use it for its intended purpose, with only minor items or corrections remaining.
- Punch List
- Related: Substantial Completion
A written list of minor defects, incomplete items, or corrections identified during a final walkthrough that the contractor must fix before final acceptance.
- Retainage
- Related: Schedule of Values, Lien Waiver
A percentage of each progress payment withheld by the owner until the project reaches substantial or final completion, providing security for unfinished or defective work.
- Contingency
- Related: Change Order, Allowance
A reserved amount of money or time set aside in a budget or schedule to cover unforeseen costs, risks, or delays during construction.
- Cash Flow Projection
- Related: Retainage, Schedule of Values
A forecast of when money will come into and leave the business over a period, helping a contractor plan for payroll, materials, and other expenses.
- Earned Value Management
- Related: Critical Path Method (CPM), Schedule of Values
A method that compares the value of work actually completed against the planned cost and schedule to measure project performance and forecast future results.
- Request for Information (RFI)
- Related: Change Order, Constructive Change
A formal written question from the contractor to the design team asking for clarification of drawings, specifications, or other contract documents.
- Scope Creep
- Related: Change Order, Constructive Change
Uncontrolled expansion of project work beyond the original contract scope, often without corresponding adjustments to price, schedule, or formal approval.
- Mechanic's Lien
- Related: Lien Waiver, Retainage
A legal claim filed against a property by a contractor, subcontractor, or supplier who has not been paid for labor, materials, or services provided to improve it.
- Lien Waiver
- Related: Mechanic's Lien, Retainage
A written document in which a person gives up the right to file a mechanic's lien, often exchanged for a progress or final payment.
- Change Order
- Related: Constructive Change, Scope Creep
A written modification to the contract, signed by authorized parties, that changes the scope, price, or schedule of the work.
- Performance Bond
- Related: Payment Bond, Bid Security
A surety bond guaranteeing that the contractor will complete the contract work according to its terms; the surety may step in if the contractor defaults.
- Payment Bond
- Related: Performance Bond, Mechanic's Lien
A surety bond that protects subcontractors and suppliers by guaranteeing they will be paid for labor and materials furnished on the bonded project.
- Indemnity Clause
- Related: Flow-Down Clause
A contract provision where one party agrees to hold the other harmless from certain claims, losses, or damages, often arising from the indemnifying party's actions.
- Notice to Proceed
A written directive from the owner authorizing the contractor to begin work on a specified date, starting the contract time.
- Statute of Repose
- Related: Mechanic's Lien
A law that sets an absolute deadline for filing lawsuits over construction defects, regardless of when the defect is discovered.
- Constructive Change
- Related: Change Order, Request for Information (RFI)
An unintended change to the work caused by the owner's or designer's actions or instructions, which may entitle the contractor to an equitable adjustment.
- Flow-Down Clause
- Related: Indemnity Clause
A contract provision that passes certain rights and obligations from the prime contract down to subcontractors, so they are bound by similar terms.
- Quantity Takeoff
- Related: Unit Price, Allowance
The process of measuring and listing the materials, labor, and equipment needed for each part of the project from the drawings and specifications.
- Unit Price
- Related: Quantity Takeoff, Allowance
A set cost per unit of measurement, such as per cubic yard or per square foot, used to price work that is difficult to quantify exactly in advance.
- Addendum
- Related: Alternates, Bid Security
A written change to the bid documents issued before bids are due, such as a correction, clarification, or additional information that becomes part of the contract.
- Alternates
- Related: Addendum, Allowance
Specific items in a bid package that offer optional prices for substituting materials, methods, or scope, allowing the owner to choose among them.
- Bid Security
- Related: Performance Bond, Payment Bond
A deposit, bond, or cashier's check submitted with a bid to guarantee the bidder will enter the contract if selected and will provide required bonds.
- Bid Shopping
- Related: Bid Security
The practice of a contractor revealing one bidder's price to others to obtain a lower price after bids have been submitted, generally considered unethical.
- Allowance
- Related: Unit Price, Contingency
A specified amount included in the contract for a particular item whose exact cost is unknown at bid time, later adjusted to the actual cost.
- Lump-Sum Contract
- Related: Change Order, Contingency
An agreement where the contractor agrees to perform a defined scope of work for a fixed total price, bearing the risk of cost overruns.
- Competent Person
- Related: Fall Protection, Excavation Protective System
An individual who is capable of identifying existing and predictable hazards and has authority to take prompt corrective measures to eliminate them.
- Fall Protection
- Related: Competent Person
A system of guards, nets, harnesses, or other equipment used to prevent workers from falling from heights or to stop a fall safely.
- Excavation Protective System
- Related: Competent Person, Confined Space
A method such as sloping, shoring, or shielding used to protect workers from cave-ins and other hazards in trenches and excavations.
- Hazard Communication
- Related: Toolbox Talk
An OSHA program requiring employers to identify chemical hazards, label containers, provide safety data sheets, and train workers about safe handling.
- Confined Space
- Related: Lockout/Tagout, Excavation Protective System
A space with limited entry and exit that is not designed for continuous occupancy and may contain hazardous atmospheres or other serious safety hazards.
- Lockout/Tagout
- Related: Confined Space
A safety procedure that isolates energy sources and locks or tags them out to prevent accidental startup or release of energy during maintenance or repair.
- Toolbox Talk
- Related: Competent Person, Hazard Communication
A short, informal safety meeting held at the job site before work begins to discuss a specific hazard, procedure, or lesson learned.
- Experience Modification Rate (EMR)
- Related: Toolbox Talk
A number used by workers' compensation insurers to compare a contractor's injury history to industry averages, affecting insurance premiums and prequalification.