CHTP flashcards
CHTP · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Balanced scorecard
- A strategy performance framework with four perspectives: financial, customer, internal process, and learning and growth; it pairs lagging outcome measures with leading driver measures.
- Capability maturity model
- A five-level process improvement scale: initial, managed, defined, quantitatively managed, and optimizing; higher levels indicate more repeatable, measured, and continuously improved processes.
- Build versus buy decision
- A sourcing rule: build when the capability is core and differentiating, buy when commodity, and partner when speed, cost, or specialized expertise outweighs internal control.
- RACI matrix
- A responsibility assignment chart using responsible, accountable, consulted, and informed; each activity has one accountable owner and at least one responsible performer.
- Three lines model
- A governance structure: the first line owns and manages risk, the second provides independent oversight and compliance, and the third is internal audit reporting to the board.
- ADKAR change model
- A change framework with five outcomes: awareness of the need, desire to participate, knowledge of how, ability to implement, and reinforcement to sustain the change.
- Availability formula
- Availability equals mean time between failures divided by the sum of mean time between failures and mean time to repair, usually expressed as a percentage of uptime.
- Little's Law
- Average work in process equals arrival rate multiplied by average time in the system; it links throughput, cycle time, and queue size in service and delivery systems.
- Idempotent operation
- An operation that produces the same result when retried; GET, PUT, and DELETE are idempotent, while POST typically creates a new record on each call.
- RTO versus RPO
- Recovery time objective is the maximum acceptable service downtime; recovery point objective is the maximum acceptable data loss measured backward in time from the disruption.
- Backup 3-2-1 rule
- Keep three copies of data, on two different media types, with one copy stored off-site; restore testing verifies that backups actually meet recovery objectives.
- PUE metric
- Power usage effectiveness equals total facility energy divided by IT equipment energy; a value closer to 1.0 indicates less overhead energy for cooling and distribution.
- Data quality dimensions
- Common measures include accuracy, completeness, consistency, timeliness, validity, and uniqueness; each dimension needs a defined rule, threshold, and accountable owner.
- ACID transactions
- Atomicity, consistency, isolation, and durability properties ensure a database transaction completes fully or not at all and survives failures without corrupting shared data.
- Data governance roles
- The data owner is accountable for a domain, the steward defines standards and rules, and the custodian operates storage and enforces technical controls.
- CIA triad
- Confidentiality protects data from unauthorized disclosure, integrity protects accuracy and completeness, and availability ensures timely access; controls are mapped to each objective.
- Risk formula
- Risk equals likelihood multiplied by impact; treatment options are avoid, mitigate, transfer, and accept, with residual risk documented after controls.
- Incident response phases
- Preparation, detection and analysis, containment, eradication, recovery, and post-incident lessons learned; containment limits spread before eradication removes the cause.
- RFP versus RFQ
- A request for proposal asks vendors to design a solution and state pricing; a request for quotation asks for price against a fully defined specification.
- Total cost of ownership
- TCO sums acquisition, implementation, licensing, support, operations, training, transition, and disposal costs over the asset life, not just the purchase price.
- Contract types risk
- Fixed-price contracts place cost risk on the seller; time-and-materials place hours risk on the buyer; cost-plus contracts reimburse allowable costs plus an agreed fee.
- Earned value management
- EVM compares planned value, earned value, and actual cost; cost variance is EV minus AC, schedule variance is EV minus PV, and indices below 1.0 are unfavorable.
- Critical path
- The longest sequence of dependent activities through a project network; it has zero float, and any delay on it delays the project completion date.
- Risk response strategies
- For threats: avoid, mitigate, transfer, accept; for opportunities: exploit, enhance, share, accept; each response has an owner, trigger, and contingency.
- Change control board
- A group authorized to review change requests, assess scope, schedule, cost, and risk impacts, and approve, defer, or reject changes before baseline updates.
- Net present value
- NPV discounts all future cash flows at the required rate and subtracts the initial investment; independent projects with NPV above zero add value.
- Internal rate of return
- The discount rate at which a project's net present value equals zero; accept when IRR exceeds the organization's hurdle rate or cost of capital.
- CapEx versus OpEx
- Capital expenditure is capitalized and depreciated over useful life; operating expenditure is expensed in the period incurred and affects current-period results.
- Break-even point
- Break-even units equal fixed costs divided by price per unit minus variable cost per unit; at that volume total revenue equals total cost.
- API gateway
- A centralized entry point that routes service calls and enforces authentication, authorization, rate limits, logging, and protocol translation for APIs.
- FHIR standard
- A healthcare interoperability standard using RESTful resources and JSON or XML; it exchanges clinical data through defined resource endpoints and terminology bindings.
- Model drift
- Degradation of a deployed machine-learning model when live data diverges from training data; monitoring triggers retraining or recalibration to restore accuracy.