Armenia Engineer Attestation study materials
Armenia Engineer Attestation study resources

Armenia Engineer Attestation study plan

Armenia Engineer Attestation · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Seismic engineering and structural safety

  • Explain how seismic zonation maps convert into design peak ground acceleration and site factors for the main soil categories.

  • Compute equivalent-static base shear for three different building heights and cross-check each result against the normative minimum lateral force limits.

  • Differentiate ductility classes and behaviour factors, then justify the class selected for a cast-in-place reinforced concrete frame.

  • Identify the ten most frequent seismic detailing errors in beams, columns and joints, and state the corrective detail for each.

Your checkpoint

A one-page decision table (soil category to site factor to spectrum parameters) plus 15 fully solved base-shear problems, self-marked at 85% or better.

Week 2

Seismic engineering and structural safety & Technical regulation, construction norms and standards

  • Apply the technical regulation hierarchy (law, government decision, code, standard) to decide which document governs a given seismic design question.

  • Check one masonry and one steel-braced building for plan and vertical regularity, torsional eccentricity and drift limits, recording every criterion that fails.

  • Lay out shear walls and their reinforcement for a nine-storey concrete building so that capacity design and confinement rules are satisfied.

  • Interpret the provisions on seismic isolation and energy dissipation and judge the building types and sites where each is permitted.

Your checkpoint

Two marked-up case studies (masonry and steel-braced) listing each failed check, the type of governing clause, and the corrective action, reviewed and corrected once.

Week 3

Structural design and analysis (concrete, steel, masonry, foundations)

  • Size and reinforce a flat-slab, a beam-and-slab and a shear-wall concrete system, then compare material quantities per square metre of floor.

  • Perform a second-order (P-delta) check and a column buckling verification for a six-storey steel moment frame.

  • Verify bearing capacity and design lintels for a masonry wall under gravity plus seismic load combinations.

  • Select and size shallow and piled foundations from a load take-down, checking bearing pressure and allowable settlement.

Your checkpoint

A design portfolio with four hand-calculated member checks (concrete slab, steel column, masonry wall, footing), each showing loading, code check and utilisation ratio.

Week 4

Structural design and analysis (concrete, steel, masonry, foundations) & Urban development and construction legislation, permitting and licensing

  • Compile a structural design basis document stating loads, load combinations, material properties and the analysis methods accepted for the project.

  • Trace the permit-to-occupancy chain for a residential building and name the document issued at each stage of the process.

  • Distinguish the legal roles and responsibilities of the designer, the technical supervisor and the licensed contractor during construction.

  • Prepare a complete permit application checklist covering every item of design documentation the authority requires.

Your checkpoint

A two-page permit roadmap flowchart plus a reusable design basis template, self-graded against a 20-item checklist with at least 18 items met.

Week 5

Urban development and construction legislation, permitting and licensing & Technical supervision, project management and occupational safety

  • Outline contractor licensing and attestation requirements, including which categories of work demand which licence class.

  • Draft a site-specific occupational safety plan covering work at height, excavation, lifting operations and temporary electrical installations.

  • Build a technical supervision schedule that names inspection points, hold points and the acceptance documentation required for a concrete frame.

  • Explain post-acceptance liability and warranty rules, and identify the categories of defect that trigger them.

Your checkpoint

A supervision and safety package (hold-point inspection plan plus safety plan) scored against a 25-item checklist, then revised to close every gap.

Week 6

Technical regulation, construction norms and standards & Construction technology, materials and quality control

  • Map each standard material test (concrete cubes, rebar tensile, weld inspection, soil compaction) to its sampling frequency and acceptance criterion.

  • Write concrete acceptance and curing procedures that hold up under both hot-weather and cold-weather placing conditions.

  • Detect nonconformities in a set of test reports you assemble yourself and issue the matching corrective instruction for each finding.

  • Compare fire-resistance requirements for structural elements and apply them to a specific multi-storey building.

Your checkpoint

A quality control and testing plan for a nine-storey concrete building, containing test frequencies, acceptance limits and a nonconformity workflow, checked for completeness by a peer or mentor.

Week 7

Building engineering systems (water, sewerage, HVAC, electrical, gas supply) & Cost estimation and normative pricing in construction

  • Size cold water supply, drainage and gas piping for a 60-apartment building and verify the result against flow and pressure limits.

  • Select heating and ventilation systems and compute heat loss through the envelope of a typical apartment.

  • Build a resource-based cost estimate covering labour, materials and machinery for one structural work package.

  • Apply normative price indices and explain the order in which overhead, profit and value added tax are added to the base cost.

Your checkpoint

A priced bill of quantities and estimate for a 1,000 square metre structural package, plus a one-page reconciliation of the result against an index-adjusted benchmark within 10%.

Week 8

Technical supervision, project management and occupational safety & Seismic engineering and structural safety & Structural design and analysis (concrete, steel, masonry, foundations)

  • Audit a project programme for sequencing, resource and inspection conflicts, then re-sequence the critical path to remove them.

  • Sit two full-length mixed mock exams under exam timing and score each one by domain.

  • Re-drill the two weakest domains identified by the mock results until each scores 75% or higher.

  • Recite from memory the legislation and normative documents most likely to be cited in an oral attestation answer.

Your checkpoint

Two timed mock exams scored by domain plus a one-page personal error log stating the corrective action for every repeated mistake.

Milestones

Week 2: Explain, without notes, how site class and ductility class change the design spectrum and base shear, in under five minutes.

Week 4: Closed-book timed test on domains 3 and 4 (40 questions in 60 minutes) at 70% or better; any subtopic below 60% is rescheduled into weeks 5-8.

Week 6: Domains 1, 2 and 5 self-test at 70% or better, and the permit roadmap is judged complete against the 20-item checklist.

Week 8: Both mock exams total 70% or better with no domain under 60%, and the error log shows no mistake repeated from week 4.