ARE 5.0: PjM key terms
ARE 5.0: PjM · Get comfortable with the vocabulary.
- Work Breakdown Structure (WBS)
- Related: Control Account, Work Package, Scope Baseline
A hierarchical decomposition of the total scope of work into progressively smaller deliverable-oriented components, used to estimate effort, assign responsibility, and control progress. Each level represents a more detailed piece of the project.
- Work Package
- Related: Work Breakdown Structure (WBS), Control Account
The lowest level of a work breakdown structure, small enough to be reliably estimated, scheduled, and assigned to one person or team. It defines a discrete unit of deliverable-producing work.
- Control Account
- Related: Work Package, Earned Value Management (EVM)
A management point in a work breakdown structure where scope, budget, actual cost, and schedule are integrated and compared to earned value. It sits above work packages and is assigned to a single accountable manager.
- Scope Baseline
- Related: Work Breakdown Structure (WBS), Change Control
The approved version of the scope statement, work breakdown structure, and WBS dictionary, against which scope changes and completion are measured. It becomes the reference for change control.
- Milestone
- Related: Gantt Chart, Critical Path Method (CPM)
A significant point or event in a project with zero duration, used to mark completion of a phase, a major deliverable, or an approval. Milestones carry no effort but signal progress and decision gates.
- Gantt Chart
- Related: Critical Path Method (CPM), Milestone
A bar chart that displays scheduled activities along a horizontal timeline, showing start and finish dates, durations, and often dependencies. It is a common visual tool for communicating a project schedule.
- Critical Path Method (CPM)
- Related: Float (Slack), Network Diagram, Gantt Chart
A scheduling technique that identifies the longest sequence of dependent activities through a network, which determines the shortest possible project duration. Activities on the critical path have zero float.
- Float (Slack)
- Related: Critical Path Method (CPM)
The amount of time an activity can be delayed without delaying a successor or the project finish date. Total float applies to the whole path; free float applies only to the next activity.
- Network Diagram
- Related: Critical Path Method (CPM), Predecessor/Successor
A graphic showing project activities as nodes connected by arrows or lines that represent dependencies. It is used to analyze sequencing and to calculate the critical path and float.
- Predecessor/Successor
- Related: Network Diagram, Lead and Lag
Activities linked by a dependency, where the predecessor must occur before the successor can begin or finish. These relationships define the logical sequence used in scheduling.
- Lead and Lag
- Related: Predecessor/Successor
Schedule modifiers applied to dependencies: lead allows a successor to start before its predecessor finishes, while lag inserts deliberate waiting time between activities. Both adjust logic without changing durations.
- Resource Leveling
- Related: Resource Smoothing, Resource Histogram
A scheduling technique that resolves over-allocation of resources by adjusting start and finish dates, often extending the project duration. It prioritizes resource limits over schedule compression.
- Resource Smoothing
- Related: Resource Leveling, Float (Slack)
A technique that shifts activities within their available float to balance resource demand without changing the project finish date. Unlike leveling, it does not extend the critical path.
- Resource Histogram
- Related: Resource Leveling, Resource Smoothing
A bar chart showing the number of resources required per time period across the project schedule. It reveals peaks and valleys used to spot over-allocation and plan leveling.
- Responsibility Assignment Matrix (RAM)
- Related: RACI Chart, Work Breakdown Structure (WBS)
A grid that maps work breakdown structure elements to project team members or roles, clarifying who does what. A common form is the RACI chart showing responsible, accountable, consulted, and informed parties.
- RACI Chart
- Related: Responsibility Assignment Matrix (RAM)
A type of responsibility assignment matrix that labels each task with who is Responsible, Accountable, Consulted, and Informed. It prevents gaps and duplication in task ownership.
- Staffing Management Plan
- Related: Resource Calendar, Team Charter
A subsidiary plan describing how project human resources will be acquired, assigned, trained, and released, including timetables and recognition. It documents roles, reporting relationships, and staff acquisition strategy.
- Resource Calendar
- Related: Staffing Management Plan, Resource Histogram
A document identifying the working days, shifts, and availability of specific resources, including vacations and holidays. It is used to schedule activities realistically around actual availability.
- Team Charter
- Related: Staffing Management Plan, Conflict Management
A document created by the project team that establishes ground rules, operating norms, communication expectations, and decision-making processes. It guides team behavior and reduces conflict.
- Tuckman Ladder
- Related: Team Charter, Conflict Management
A model describing team development stages: forming, storming, norming, performing, and adjourning. Project managers adjust leadership style to match the team's current stage.
- Conflict Management
- Related: Team Charter, Tuckman Ladder
The process of identifying and addressing disagreements among stakeholders or team members using approaches such as collaborating, compromising, forcing, avoiding, or accommodating. Collaboration is generally preferred for lasting resolution.
- Motivation Theory (Herzberg)
- Related: Team Charter
A framework distinguishing hygiene factors, such as pay and working conditions, from motivators, such as achievement and recognition. Hygiene factors prevent dissatisfaction but do not by themselves motivate.
- Virtual Team
- Related: Communication Management Plan, Team Charter
A group of project members working from different locations and often time zones, connected through technology. Managing them requires deliberate communication planning and clear protocols.
- Communication Management Plan
- Related: Virtual Team, Stakeholder Engagement Plan
A document specifying who needs what information, when, in what format, and through which channel. It guides stakeholder communication and reduces miscommunication on projects.
- Stakeholder Engagement Plan
- Related: Communication Management Plan, Risk Register
A plan describing how the project will involve stakeholders based on their interest and influence, including strategies to gain support and manage resistance. It often uses a power/interest grid.
- Risk Register
- Related: Risk Response, Risk Appetite
A living document listing identified risks with their probability, impact, owner, and planned response. It is the central tool for tracking and controlling project risk throughout the project.
- Risk Response
- Related: Risk Register, Contingency Reserve
A planned action to address an identified risk, typically escalate, avoid, transfer, mitigate, or accept for threats, and exploit, share, enhance, or accept for opportunities. Each response is assigned an owner.
- Risk Appetite
- Related: Risk Threshold, Risk Register
The degree of uncertainty an organization or stakeholder is willing to accept in pursuit of objectives. It shapes which risks are tolerated and how aggressive responses should be.
- Risk Threshold
- Related: Risk Appetite, Risk Register
A defined level of risk exposure above which action is required or the project escalates to higher authority. It translates risk appetite into measurable decision points.
- Contingency Reserve
- Related: Management Reserve, Risk Response
Budget or time set aside to address known risks with identified responses, often called known unknowns. It is controlled by the project manager and released as risks are realized.
- Management Reserve
- Related: Contingency Reserve, Change Control
Budget or time held by senior management for unforeseen work within the project scope, often called unknown unknowns. It is not part of the cost baseline and requires approval to use.
- Qualitative Risk Analysis
- Related: Quantitative Risk Analysis, Risk Register
A subjective prioritization of risks by assessing probability and impact to rank them for further action. It is fast and used to focus attention on the most significant risks.
- Quantitative Risk Analysis
- Related: Qualitative Risk Analysis, Expected Monetary Value (EMV)
A numerical analysis of the combined effect of identified risks on project objectives, using techniques such as Monte Carlo simulation. It produces probabilistic estimates of cost and schedule outcomes.
- Expected Monetary Value (EMV)
- Related: Quantitative Risk Analysis, Contingency Reserve
A risk analysis calculation multiplying the probability of an event by its financial impact, producing a weighted average outcome. It helps compare the cost-effectiveness of risk responses.
- Change Control
- Related: Scope Baseline, Contingency Reserve
The formal process for requesting, evaluating, approving, and documenting changes to the project baseline. It ensures changes are assessed for impact before being incorporated.
- Earned Value Management (EVM)
- Related: Control Account, Contingency Reserve
A technique integrating scope, schedule, and cost to measure project performance by comparing planned value, earned value, and actual cost. It forecasts variances and estimates at completion.
- Parametric Estimating
- Related: Analogous Estimating, Bottom-Up Estimating
An estimating technique that uses a statistical relationship between historical data and variables, such as cost per square foot, to calculate activity durations or costs. Accuracy depends on reliable historical data.
- Bottom-Up Estimating
- Related: Parametric Estimating, Work Package
A technique that estimates the cost or duration of individual work packages and rolls them up to a total. It is generally the most accurate but also the most time-consuming method.
- Analogous Estimating
- Related: Parametric Estimating, Bottom-Up Estimating
A top-down technique that uses the actual cost or duration of a similar past project as the basis for a new estimate. It is quick but less accurate than detailed methods.