ASHRAE HBDP study materials
ASHRAE HBDP study resources

ASHRAE HBDP study plan

ASHRAE HBDP · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

High-Performance Building Design & Energy Analysis and Modeling

  • Map the load-reduction hierarchy (envelope, glazing, massing, orientation) and explain how each measure shifts heating and cooling loads

  • Compute a simple peak cooling load by hand from a stated envelope, occupancy, lighting, and internal-gain schedule

  • Distinguish whole-building energy use intensity from peak demand and explain why each drives different design decisions

  • Outline the steps of an iterative design-analysis loop and identify where each occurs in a project schedule

Your checkpoint

A one-page worked load calculation with assumptions listed and a labeled design-analysis loop diagram

Week 2

High-Performance Building Design & Energy Analysis and Modeling

  • Compare passive and active design strategies and justify which apply to a stated climate and program

  • Select glazing and shading parameters for a stated orientation and defend the tradeoff between daylight, solar gain, and thermal loss

  • Describe how HVAC system selection follows from load shape, part-load behavior, and ventilation requirements

  • Identify the inputs and outputs of a whole-building energy simulation and flag common assumption errors

Your checkpoint

A strategy matrix matching five design measures to climate, program, and expected load impact, with a written rationale for each

Week 3

High-Performance Building Design & Energy Analysis and Modeling

  • Set up a baseline-versus-proposed energy model comparison and state the conditions that must be held constant

  • Explain how weather data, schedules, and internal gains propagate into annual energy results

  • Interpret simulation outputs (end-use breakdown, unmet load hours, peak timing) and translate them into design recommendations

  • Distinguish calibration, validation, and sensitivity analysis and state when each is appropriate

Your checkpoint

An annotated end-use breakdown table for a baseline and one alternative, with three prioritized design recommendations

Week 4

Energy Analysis and Modeling & Indoor Environmental Quality

  • Quantify how ventilation rate, occupancy density, and filtration interact with energy use

  • Evaluate thermal comfort using operative temperature, air speed, and metabolic and clothing assumptions

  • Differentiate source control, dilution ventilation, and filtration as contaminant strategies

  • Describe how daylighting and electric lighting design affect both visual comfort and cooling load

Your checkpoint

A comfort and ventilation tradeoff memo covering two design options with stated assumptions and a recommended path

Week 5

Indoor Environmental Quality & Commissioning and Operations

  • Write measurable indoor environmental quality acceptance criteria for thermal, acoustic, and air-quality performance

  • Sequence commissioning activities from pre-design through functional performance testing and identify the responsible party at each stage

  • Draft functional test procedures for an air-handling unit and a terminal box with pass/fail criteria

  • Explain how measurement and verification baselines are established and adjusted over time

Your checkpoint

A commissioning plan outline with a functional test procedure for one air-handling unit and explicit pass/fail thresholds

Week 6

Commissioning and Operations & Water and Materials Efficiency

  • Distinguish commissioning, retrocommissioning, and ongoing commissioning and select the right approach for a stated building condition

  • Diagnose common operational faults (simultaneous heating and cooling, economizer failure, sensor drift) from trend data

  • Calculate indoor and outdoor water use reductions for a stated fixture and irrigation retrofit

  • Compare material selection criteria including durability, recycled content, and life-cycle impacts

Your checkpoint

A trend-data fault diagnosis write-up for two faults plus a water-savings calculation with a stated baseline

Week 7

Water and Materials Efficiency & High-Performance Building Design

  • Perform a life-cycle cost comparison of two design options including first cost, energy, water, and maintenance

  • Explain how water and materials decisions feed back into energy performance and occupant health

  • Assess construction and demolition waste diversion strategies against stated targets

  • Integrate high-performance design, water, and materials measures into a single coherent project narrative

Your checkpoint

A life-cycle cost comparison table for two options with a one-page recommendation that ties in water and materials impacts

Week 8

High-Performance Building Design & Energy Analysis and Modeling & Indoor Environmental Quality & Commissioning and Operations & Water and Materials Efficiency

  • Synthesize all five domains into an integrated design review checklist for a hypothetical project

  • Re-derive the highest-risk calculations from memory and check them against your earlier work

  • Practice timed recall across all domains and close the gaps you identify

  • Write a concise project summary that defends each major decision with quantitative support

Your checkpoint

A full integrated design review package (checklist plus summary) covering all five domains with numbers cited for each recommendation

Milestones

Week 2: Complete the strategy matrix and correctly compute a peak cooling load from a stated schedule without reference notes

Week 4: Explain baseline-versus-proposed modeling assumptions and comfort tradeoffs to a colleague and answer follow-up questions unaided

Week 6: Diagnose two operational faults from trend data and produce a defensible water-savings calculation

Week 8: Deliver the integrated review package and score at least 80 percent on a self-made timed recall set spanning all five domains