CDFOM study materials
CDFOM study resources

CDFOM key terms

CDFOM · Get comfortable with the vocabulary.

Service Level Agreement (SLA)

A written contract between the data centre provider and its customer that states the services delivered, the measurable performance targets, and the remedies if those targets are missed.

Related: Key Performance Indicator (KPI), Operational Level Agreement (OLA)
Key Performance Indicator (KPI)

A quantifiable measure chosen to show whether an operational process is meeting its target, such as percentage of change requests completed on schedule or average time to resolve incidents.

Related: Service Level Agreement (SLA), Mean Time to Repair (MTTR)
Operational Level Agreement (OLA)

An internal agreement between teams inside the same organisation that fixes the responsibilities and response times each team owes the others so that external service commitments can be met.

Related: Service Level Agreement (SLA), Incident Management
Incident Management

The process for detecting, logging, escalating, and restoring service after an unplanned disruption, with priority set by business impact rather than by the technical size of the fault.

Related: Problem Management, Mean Time to Repair (MTTR)
Problem Management

The discipline of finding and eliminating the underlying causes of repeated incidents, usually through root cause analysis, so that the same failure does not recur.

Related: Incident Management, Root Cause Analysis (RCA)
Change Management

A controlled process in which planned alterations to facilities, systems, or configurations are assessed for risk, approved by authorised staff, scheduled, implemented, and then verified.

Related: Configuration Management Database (CMDB), Method of Procedure (MOP)
Method of Procedure (MOP)

A step-by-step written instruction for carrying out a specific task safely, including prerequisites, sequence of actions, verification points, and the rollback plan if the task fails.

Related: Standard Operating Procedure (SOP), Change Management
Standard Operating Procedure (SOP)

A documented routine instruction describing how a recurring operational activity is performed consistently, used for training staff and for demonstrating that work follows an approved method.

Related: Method of Procedure (MOP), Competence Matrix
Planned Preventive Maintenance (PPM)

Scheduled servicing carried out at fixed intervals or according to equipment run hours to reduce the likelihood of failure and to keep manufacturer warranties valid.

Related: Condition-Based Maintenance (CBM), Corrective Maintenance
Corrective Maintenance

Work performed to restore a failed or degraded asset to acceptable operating condition, ranging from minor repair to full component replacement after a breakdown.

Related: Planned Preventive Maintenance (PPM), Mean Time to Repair (MTTR)
Condition-Based Maintenance (CBM)

Maintenance triggered by measured evidence of deteriorating condition, such as vibration analysis, thermography, or oil sampling, rather than by a fixed calendar interval.

Related: Planned Preventive Maintenance (PPM), Predictive Maintenance
Mean Time Between Failures (MTBF)

The average operating time between one failure and the next for a repairable asset, used to compare equipment reliability and to forecast spare-parts demand.

Related: Mean Time to Repair (MTTR), Availability
Mean Time to Repair (MTTR)

The average elapsed time needed to restore an asset to service after failure, including diagnosis, access, repair, and testing, and a key driver of achieved availability.

Related: Mean Time Between Failures (MTBF), Availability
Critical Spares

Spare parts and components held on site because their absence would extend an outage beyond the tolerated limit, selected by failure impact and supplier lead time.

Related: Mean Time to Repair (MTTR), Concurrent Maintainability
Concurrent Maintainability

The property of a design that allows any item of plant to be serviced or replaced while the IT load continues to be supported, typically by redundant capacity and isolation points.

Related: Redundancy (N+1), Critical Spares
Redundancy (N+1)

Provision of one more capacity unit than the load requires, so that a single failure or maintenance shutdown does not interrupt service to the supported IT equipment.

Related: 2N Configuration, Concurrent Maintainability
2N Configuration

A topology in which two complete, independent capacity paths are installed, each able to carry the full load alone, giving protection against a single failure at any point.

Related: Redundancy (N+1), Availability
Availability

The proportion of time a system is capable of performing its intended function, usually expressed as a percentage over a period and derived from failure frequency and repair duration.

Related: Mean Time Between Failures (MTBF), Mean Time to Repair (MTTR)
Uninterruptible Power Supply (UPS)

A battery-backed system that supplies conditioned power to IT loads for a short bridging period until generators start or the mains supply recovers.

Related: Standby Generator, Power Usage Effectiveness (PUE)
Standby Generator

An engine-driven alternator kept ready to supply the facility when the utility feed fails, requiring periodic load testing and fuel quality management to remain dependable.

Related: Uninterruptible Power Supply (UPS), Business Continuity Plan (BCP)
Power Usage Effectiveness (PUE)

Total facility energy divided by the energy delivered to IT equipment; a ratio where 1.0 is theoretical perfection and higher values indicate more overhead energy use.

Related: Uninterruptible Power Supply (UPS), Thermal Management
Thermal Management

Control of temperature and humidity in white space through cooling equipment, airflow containment, and setpoints so that equipment stays within manufacturer operating envelopes.

Related: Hot/Cold Aisle Containment, Power Usage Effectiveness (PUE)
Hot/Cold Aisle Containment

A physical arrangement that separates equipment intake air from exhaust air using barriers and aisle layout, preventing recirculation and improving cooling efficiency.

Related: Thermal Management, Power Usage Effectiveness (PUE)
Business Continuity Plan (BCP)

A documented set of arrangements that keeps essential services running during and after a disruption, covering people, processes, and technology dependencies across the organisation.

Related: Disaster Recovery Plan (DRP), Recovery Point Objective (RPO)
Disaster Recovery Plan (DRP)

The technical component of continuity planning that describes how IT systems and data are restored at an alternate location after a major loss of the primary facility.

Related: Business Continuity Plan (BCP), Recovery Time Objective (RTO)
Recovery Time Objective (RTO)

The maximum acceptable elapsed time between a disruption and the restoration of a service, used to size standby capacity and staffing for recovery.

Related: Recovery Point Objective (RPO), Disaster Recovery Plan (DRP)
Recovery Point Objective (RPO)

The maximum acceptable amount of data loss measured in time before a disruption, which determines how frequently backups or replication must occur.

Related: Recovery Time Objective (RTO), Business Continuity Plan (BCP)
Capacity Planning

Forecasting future demand for power, cooling, space, and network ports, then scheduling investment so that headroom is available before limits are reached.

Related: Rack Power Density, Availability
Rack Power Density

The electrical load a single rack is designed or permitted to draw, expressed in kilowatts, which drives cooling design, cabling choices, and floor loading assumptions.

Related: Capacity Planning, Thermal Management
Physical Access Control

Layered measures such as badge readers, mantraps, biometrics, and visitor escort rules that ensure only authorised people reach defined security zones.

Related: Visitor Management, Security Zone
Security Zone

A defined area of the facility with its own access rules and threat level, so that controls tighten progressively from the perimeter through offices to the white space.

Related: Physical Access Control, Visitor Management
Visitor Management

The process of pre-registering, identifying, badging, escorting, and logging external people on site, and confirming their departure, to prevent unauthorised presence.

Related: Physical Access Control, Security Zone
Permit to Work (PTW)

A formal authorisation issued before high-risk activity such as hot work or electrical isolation, recording hazards, controls, isolations, and the person accountable for the task.

Related: Lockout/Tagout (LOTO), Method of Procedure (MOP)
Lockout/Tagout (LOTO)

A safety procedure that isolates energy sources and attaches personal locks and tags so equipment cannot be re-energised while someone is working on it.

Related: Permit to Work (PTW), Method of Procedure (MOP)
Competence Matrix

A grid mapping each staff member against the skills and authorisations their role requires, used to plan training and to confirm shift coverage by qualified people.

Related: Standard Operating Procedure (SOP), Shift Handover
Shift Handover

A structured briefing at change of shift that transfers open incidents, pending changes, equipment status, and site risks to the incoming team in a recorded format.

Related: Competence Matrix, Incident Management
Root Cause Analysis (RCA)

A structured investigation method that traces an incident back to its underlying causes rather than the immediate trigger, producing actions that prevent recurrence.

Related: Problem Management, Incident Management
Configuration Management Database (CMDB)

A repository recording the facility and IT assets, their attributes, and the dependencies between them, used to assess change impact and support fault diagnosis.

Related: Change Management, Root Cause Analysis (RCA)
Audit Trail

A chronological, tamper-evident record of who did what and when across access, change, and maintenance systems, relied on during investigations and compliance reviews.

Related: Configuration Management Database (CMDB), Physical Access Control