PEB Singapore PPE Mechanical study materials
PEB Singapore PPE Mechanical study resources

PEB Singapore PPE Mechanical case studies

PEB Singapore PPE Mechanical · Put your knowledge to work in context.

The Professional Practice Examination (Mechanical Engineering) is the written stage that the Professional Engineers Board, Singapore, sets for engineers seeking registration as a Professional Engineer in the mechanical branch. It is not a replay of a university syllabus. The PEB Singapore PPE Mechanical case studies are 5 cases and about 4,497 words.

1

Uprating an Ageing Air Receiver: Code Thickness Versus Local Pitting

A plant owner wants to raise the compressed-air header from 8 to 10 barg and has asked you to endorse the existing vertical receiver for the higher pressure. The records show: shell to SA-516 Gr 70, outside diameter 1219 mm, nominal thickness 9.5 mm, longitudinal seam spot-radiographed (joint efficiency 0.85), allowable stress 138 MPa, built in 2004 with a 1.5 mm corrosion allowance.

843 words, about 4 min
2

Warm Upper Floors and a Low Plant Delta-T: Capacity or Distribution?

A 12-storey office tower has levels 5–8 served by one AHU, design 24,000 m³/h through a 105 kW chilled-water coil at 7/12.5 °C, with two-way control valves throughout. Occupants on the upper floors complain of afternoon heat and stuffiness.

900 words, about 5 min
3

Batch Reactor Scale-Up: Fire-Case Relief Is Not the Governing Scenario

A batch reactor of 6.0 m³ working volume is charged with 4,500 kg of reaction mass of specific heat 3.2 kJ/(kg·K). Normal operating temperature is 70 °C on jacket steam at 6 barg.

895 words, about 4 min
4

Concurrent Delay, Liquidated Damages and an Instruction to Withhold Certification

You are the Engineer's representative on an S 18 million PSSCOC contract for the ACMV upgrade of an operating hospital. Completion is 30 June, liquidated damages S 30,000/day.

945 words, about 5 min
5

Chiller Replacement Economics: Which kW/RT Are You Actually Buying?

An office owner's metered chiller-plant energy is 1.90 GWh over a 3,600-hour year at an average load of 620 RT, with electricity at S 0.26/kWh. The plant is three 400 RT water-cooled screw chillers (two duty), constant-speed primary pumps and fixed-speed cooling towers, with an implied plant performance of 0.85 kW/RT (chillers about 0.68, pumps 0.11, towers 0.06).

914 words, about 5 min