PEB Singapore PPE Mechanical · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Mechanical Engineering Design and Analysis & Building Services and HVAC Systems

  • Compute design cooling loads by hand for one office space and one dense-occupancy meeting room, showing every line of the CLTD/CLF or equivalent build-up with stated assumptions.

  • Size the supply and return duct runs for a single 0.5 m3/s system using the equal-friction method and verify against velocity and noise limits.

  • Calculate pump head and flow for a chilled-water circuit including coil, pipe, fitting and control-valve losses, and state the required NPSH margin.

  • Solve five mechanical integrity problems from first principles (pipe wall thickness under internal pressure, shaft torsional stress, support span, bolt preload, expansion loop).

  • Build a personal formula and unit-conversion sheet for Domains 1 and 2 and cross-check every unit by dimensional analysis.

Your checkpoint

A calculation pack of at least 8 pages containing the two cooling-load calculations, the duct and pipe sizing sheets and the five integrity problems, each with assumptions, unit checks and a one-line sanity check on the answer.

Week 2

Mechanical Engineering Design and Analysis & Building Services and HVAC Systems

  • Plot and interpret five psychrometric processes (coil cooling and dehumidification, mixing, reheat, evaporative cooling, economiser cycle) and calculate apparatus dew point, bypass factor and sensible heat ratio for each.

  • Apply the fan and pump affinity laws to two retrofit scenarios and quantify the change in flow, head, absorbed power and motor loading.

  • Select and justify AHU components, control-valve authority and damper selection for a given duty, explaining the consequence of poor authority.

  • Compare VAV, chilled-water fan coil and VRF systems on energy, space, maintenance and controls complexity for a 10-storey office and defend one choice in writing.

  • Quantify how outdoor-air ventilation rates and occupancy diversity change coil load, and state the design assumption you would lock in.

Your checkpoint

A 25-question self-written test on Domains 1 and 2, sat closed-book in 40 minutes, scored at 75 percent or better, supported by an error log that names the root cause of every miss (concept, arithmetic, misread, unit).

Week 3

Safety, Health, Environment and Risk Management

  • Run a qualitative HAZOP on a fuel-oil storage and transfer system, generating nodes, deviations, causes, consequences and safeguards in a structured worksheet.

  • Classify hazardous-area zones for a plant room with a flammable-gas release and specify the corresponding equipment protection concept, temperature class and ingress protection.

  • Apply the hierarchy of controls to three mechanical workshop hazards and write the permit-to-work elements for hot work and confined-space entry.

  • Assemble the fire-safety provisions for a mechanical plant room: compartmentation, separation, escape travel, detection and suppression basis, citing the applicable clause for each.

  • Investigate one constructed incident using 5-why and bow-tie analysis and derive corrective actions with owners and due dates.

Your checkpoint

A 6-page risk pack containing the completed HAZOP worksheet for one system, a risk register with likelihood, severity and residual ratings, and an action table naming an owner and target date for each mitigation.

Week 4

Project Management and Construction Practice

  • Decompose a chiller plant replacement into a work breakdown structure and precedence network, then compute the critical path, total float and free float.

  • Resource-load an 8-week programme and set an earned-value baseline, calculating PV, EV, AC, SPI, CPI and estimate at completion for one progress scenario.

  • Draft an inspection and test plan covering pipe supports, hydrostatic pressure testing, flushing, chemical cleaning and commissioning of the chilled-water system.

  • Sequence the statutory submissions, inspections and approvals needed for a plant installation and list the handover records required (as-builts, O and M manuals, test packs, training records).

  • Assess a variation and an extension-of-time claim, quantifying the cost and time impact and stating the contractual basis for entitlement.

Your checkpoint

A one-page CPM and earned-value dashboard for the chiller replacement plus the completed inspection and test plan table, and a milestone mock of 50 mixed questions on Domains 1, 2, 7 and 4 sat in 75 minutes, scored at 65 percent or better.

Week 5

Energy Efficiency, Sustainability and Engineering Economics

  • Compute life-cycle cost for two chiller options using NPV, simple payback and IRR, and run a sensitivity analysis on electricity tariff and plant life.

  • Estimate annual HVAC energy use from load factors or a simplified bin method and calculate the kWh and cost savings from a variable-speed drive retrofit.

  • Evaluate a heat-recovery, heat-pump or solar PV measure with a carbon account in kgCO2e per year and state the emission factor assumptions used.

  • Map a set of efficiency measures to recognised green-building or energy-management criteria and identify the evidence needed to claim each one.

  • Rank three capital projects by economic merit and justify the ranking when the cheapest first-cost option is not the best value.

Your checkpoint

A 2-page investment appraisal with a cash-flow table, NPV, payback, IRR, annual kWh and CO2e reduction, a sensitivity table and a defensible written recommendation.

Week 6

Plant, Manufacturing and Process Equipment

  • Select and size a pump, an air compressor, a shell-and-tube heat exchanger and a pressure vessel for stated duties, applying design margins and an NPSH check.

  • Identify the registration, inspection and testing obligations that apply to a pressure vessel in service, and list the records a plant engineer must retain.

  • Build an FMEA for a compressed-air system, listing at least ten failure modes with severity, occurrence and detection scoring and an RPN ranking.

  • Lay out a plant room so that maintenance access, lifting paths, ventilation and material flow are all satisfied, and annotate the clearances.

  • Compare batch and continuous process configurations for one product on capital cost, changeover, labour and energy.

Your checkpoint

An equipment datasheet plus a ranked FMEA table for one packaged plant package such as a compressed-air station, with the top five risks mapped to specific maintenance tasks and spares holdings.

Week 7

Engineering Ethics and Professional Conduct & Law, Contracts and Regulatory Compliance

  • Resolve six constructed ethical dilemmas (conflict of interest, pressure to sign off non-compliant work, whistleblowing, facilitating payment, working outside competence, concealing a test failure) by stating the rule, the duty owed and the action you would take.

  • Explain the elements of a valid contract and how variations, extension of time, liquidated damages, retention and defects liability operate in a standard construction form.

  • Distinguish professional negligence from contractual liability and outline the practical effect on professional indemnity cover and record-keeping.

  • State the designer's and employer's statutory duties for safety and the boundary of a professional engineer's scope of practice, with the consequence of exceeding it.

  • Draft a short written response to a client instruction that is technically unsafe but commercially attractive, citing the governing obligation.

Your checkpoint

An ethics and contract casebook of ten short scenarios, each answered in a fixed format of rule, applicable obligation, chosen action and consequence of the alternative action.

Week 8

Mechanical Engineering Design and Analysis & Building Services and HVAC Systems & Project Management and Construction Practice & Safety, Health, Environment and Risk Management & Energy Efficiency, Sustainability and Engineering Economics

  • Sit two full-length timed mock examinations under open-book conditions and score at least 70 percent overall with no single domain below 60 percent.

  • Re-work every missed item into a one-page trap list grouped by failure type and re-test each trap until answered correctly twice.

  • Practise locating the governing clause in a code or standard within two minutes for ten typical exam prompts.

  • Condense all eight domains into a master revision sheet of six pages or fewer, with the highest-yield formulas, limits and procedural steps.

  • Rehearse the exam-day routine: time per question, flagging strategy, reference tabbing and the order in which you will attack the paper.

Your checkpoint

A 6-page master revision sheet covering all eight domains plus a score and remediation log for both mock examinations showing the percentage gain between the first and second attempt.

Milestones

Week 2: Domain 1 and 2 formula sheet completed and signed off by self-review, and the 25-question self-test scored at 75 percent or better with an error log written.

Week 4: 50-question timed mixed mock on Domains 1, 2, 7 and 4 completed within 75 minutes at 65 percent or better, and every wrong answer traced to a named root cause.

Week 6: All four heaviest domains (1, 2, 7 and 4) re-tested at 70 percent or better, and the Domain 8 investment appraisal and Domain 3 FMEA both finished to the required format.

Week 8: Two full-length mocks sat under timed conditions with at least 70 percent overall and no domain below 60 percent, master revision sheet completed, and a written list of the three remaining weak areas with a plan to close each before the exam.