PEB Singapore PPE Mechanical flashcards
PEB Singapore PPE Mechanical · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Bending stress equation
- For a beam in bending, stress at distance y from the neutral axis is σ = My/I, or σ = M/Z, where the section modulus Z = I/c.
- Soderberg fatigue criterion
- A conservative fatigue design rule stating σa/Se + σm/Sy = 1, where σa is alternating stress, σm mean stress, Se endurance limit and Sy yield strength.
- Hoop stress thin cylinder
- A thin-walled cylinder under internal pressure p has hoop stress pr/t and longitudinal stress pr/2t, so the hoop stress is twice the longitudinal stress.
- Euler buckling load
- Elastic critical load of a slender column, Pcr = π²EI/(KL)², with K = 0.5 fixed-fixed, 0.7 fixed-pinned, 1.0 pinned-pinned and 2.0 cantilever.
- Fan affinity laws
- At constant impeller diameter and air density, flow varies with speed N, pressure with N squared and shaft power with N cubed, so a 20% speed cut saves about 49% power.
- Coefficient of performance
- COP is useful cooling delivered divided by work input. For chillers, kW/RT equals 3.517 divided by COP, since one refrigeration ton is 3.517 kW.
- Air changes per hour
- ACH equals 3600 multiplied by volumetric airflow in cubic metres per second, divided by room volume in cubic metres, used for ventilation and plant-room design checks.
- Sensible heat of air
- Approximate sensible heat change of an air stream, Qs in watts ≈ 1.21 × volume flow in litres per second × temperature difference in kelvin, for standard air density.
- Log mean temperature difference
- LMTD = (ΔT1 − ΔT2)/ln(ΔT1/ΔT2), where ΔT1 and ΔT2 are the terminal temperature differences of a heat exchanger; a correction factor applies to multipass units.
- Net positive suction head available
- NPSHa = (Pa − Pv)/(ρg) + Hs − Hf, using absolute suction pressure, vapour pressure, static suction head and friction loss. Cavitation occurs when NPSHa is below the pump's NPSHr.
- Hydrostatic test pressure
- Pressure vessels are normally hydrostatically tested at 1.3 times the maximum allowable working pressure, adjusted by the ratio of allowable stress at test to design temperature.
- Pump shaft power
- Shaft power in kW = ρgQH/(1000η), where Q is flow in cubic metres per second, H total head in metres, ρ density and η pump efficiency.
- Total float in CPM
- Total float equals late start minus early start, or late finish minus early finish. Activities on the critical path have zero total float, so any delay there delays completion.
- Cost performance index
- CPI equals earned value divided by actual cost. A CPI below 1.0 means work is costing more than budgeted, and EAC is often forecast as BAC divided by CPI.
- PERT expected duration
- Expected duration te = (O + 4M + P)/6, weighting the most likely value four times; activity standard deviation is (P − O)/6, used for schedule confidence estimates.
- Schedule variance
- Schedule variance equals earned value minus planned value. A negative value indicates the project is behind schedule; SV is expressed in cost units, unlike the dimensionless SPI.
- Public safety paramount duty
- Under the Professional Engineers Act and the PEB code of conduct, an engineer's first obligation is public safety, health and welfare, overriding loyalty to client or employer.
- Conflict of interest disclosure
- An engineer must declare any financial or personal interest capable of biasing technical judgement, such as shares in a tendering contractor, and withdraw if it cannot be managed.
- Competence limit in practice
- An engineer should accept only work for which they hold current competence; where a task exceeds it they must engage a qualified specialist and remain accountable for coordination.
- Confidentiality obligation
- Client and employer information obtained during an engagement must not be disclosed without authority, and the duty survives the appointment, subject to legal or safety exceptions.
- Professional Engineers Act
- A Singapore statute administered by the Professional Engineers Board that governs registration, the practising certificate, disciplinary offences and use of the reserved title Professional Engineer.
- Security of Payment adjudication
- The Building and Construction Industry Security of Payment Act gives contractors a statutory right to progress payments and rapid adjudication, rendering 'pay when paid' clauses void.
- Liquidated damages
- A pre-agreed sum per day of delay that must be a genuine pre-estimate of the employer's loss; if it operates as a penalty it is unenforceable.
- Design and build contract
- A single contract under which the contractor is responsible for both design and construction, so the employer states performance requirements and the contractor carries design risk.
- Hierarchy of controls
- Ranked risk controls: elimination, substitution, engineering controls, administrative controls and PPE. Higher-ranked controls are more reliable because they do not depend on human behaviour.
- Permit to work
- A documented authorisation controlling high-risk tasks such as hot work, confined space entry or live electrical work, confirming isolations, gas tests and precautions before work starts.
- ALARP principle
- As Low As Reasonably Practicable: residual risk must be reduced until further measures are grossly disproportionate in cost, time or trouble to the benefit gained.
- HAZOP guide words
- A structured P&ID review applying words such as no, more, less, as well as, part of and reverse to process parameters to identify deviations, causes and consequences.
- Net present value
- NPV discounts all future project cash flows at the required rate of return and subtracts the initial investment; a positive NPV means the project adds value.
- Simple payback period
- Payback equals initial capital cost divided by annual net savings. It is quick to compute but ignores the time value of money and all cash flows after payback.
- BCA Green Mark
- Singapore's green building rating scheme, with levels from Certified through Gold, GoldPLUS, Platinum and Super Low Energy to Zero Energy, scoring energy, water and environmental performance.
- Chiller plant efficiency
- Expressed as kW of electrical input per refrigeration ton of cooling. About 0.65 kW/RT is typical good practice, while high-efficiency plants reach 0.5 kW/RT or better.