Professional Engineer (PE)

An engineer registered with Singapore's Professional Engineers Board under the Professional Engineers Act, entitled to take professional responsibility for mechanical engineering works and to submit statutory plans and calculations.

Related: Qualified Person (QP), Code of Professional Conduct
Qualified Person (QP)

A person appointed under the Building Control Act to prepare, submit and supervise building plans and works; mechanical submissions require a QP who is a registered Professional Engineer.

Related: Professional Engineer (PE), Temporary Occupation Permit (TOP)
Code of Professional Conduct

Rules under Singapore's Professional Engineers Act setting expected standards of integrity, competence, independence and public safety for registered engineers, breach of which can lead to disciplinary action.

Related: Professional Engineer (PE), Conflict of interest
Conflict of interest

A circumstance where an engineer's financial, personal or other interest could improperly influence professional judgement; it must be disclosed and managed, or the engineer should withdraw from the decision.

Related: Code of Professional Conduct
Professional indemnity insurance

Insurance protecting an engineer or firm against claims for negligence, error or omission in professional services, covering legal defence and compensation up to a stated limit.

Related: Professional Engineer (PE)
Continuing Professional Development (CPD)

Structured learning, training and professional activities that registered engineers undertake to keep knowledge and skills current, counted toward renewal of their practising certificate with the Professional Engineers Board.

Related: Professional Engineer (PE)
Workplace Safety and Health Act (WSH Act)

Singapore statute imposing duties on employers, occupiers, principals and workers to ensure safety and health at work, supported by regulations on risk management, incident reporting and specific hazards.

Related: Risk assessment, Permit-to-Work (PTW)
Risk assessment

A systematic review that identifies hazards, estimates the likelihood and severity of harm, and records controls needed to reduce risk before work starts.

Related: Hierarchy of controls, Permit-to-Work (PTW)
Hierarchy of controls

The preferred order of risk controls: elimination, substitution, engineering controls, administrative controls and finally personal protective equipment; higher levels generally give more reliable protection.

Related: Risk assessment
Permit-to-Work (PTW)

A formal written authorisation for high-risk work such as hot work, confined-space entry or work on energised plant, confirming specified precautions are in place before work begins.

Related: Lockout-Tagout (LOTO), Risk assessment
Lockout-Tagout (LOTO)

A procedure that isolates all energy sources and fits locks and warning tags so equipment cannot be restarted during maintenance, preventing injury from unexpected energisation or stored energy.

Related: Permit-to-Work (PTW)
Building Control Act

Singapore law regulating building works, submission and approval of plans, supervision, and permits such as TOP and CSC, administered by the Building and Construction Authority.

Related: Qualified Person (QP), Temporary Occupation Permit (TOP)
Fire Safety Act

Singapore law administered by the Singapore Civil Defence Force that requires fire safety measures, fire safety certificates and duties for buildings, supported by the Fire Code.

Related: Fire Code, Fire damper
Fire Code

The Code of Practice for Fire Precautions in Buildings issued by SCDF, prescribing technical requirements for means of escape, smoke control, fire dampers and protection of openings.

Related: Fire Safety Act, Smoke control system
Energy Conservation Act

Singapore legislation requiring prescribed large energy users and buildings to measure, report and improve energy efficiency, including energy management systems and minimum energy performance standards.

Related: BCA Green Mark, kW/RT
Security of Payment Act (SOPA)

The Building and Construction Industry Security of Payment Act gives parties a statutory right to progress payments and fast adjudication, and limits pay-when-paid clauses in construction contracts.

Related: Public Sector Standard Conditions of Contract (PSSCOC), Variation Order
Public Sector Standard Conditions of Contract (PSSCOC)

A standard form widely used for Singapore public works, setting out obligations, payment, variations, extension of time and dispute procedures for construction and engineering contracts.

Related: Variation Order, Extension of Time (EOT)
Variation Order

A formal instruction that changes the scope, quantity, quality or timing of contracted works, with cost and time effects valued under the contract.

Related: Extension of Time (EOT), Public Sector Standard Conditions of Contract (PSSCOC)
Extension of Time (EOT)

An extension of the contractual completion date granted for qualifying delays, so the contractor is not liable for liquidated damages for that period.

Related: Liquidated damages, Variation Order
Liquidated damages

A pre-agreed amount payable by the contractor for each day of delay beyond the completion date, representing a genuine estimate of the employer's likely loss.

Related: Extension of Time (EOT), Public Sector Standard Conditions of Contract (PSSCOC)
Temporary Occupation Permit (TOP)

A permit issued by BCA allowing a completed building to be occupied before statutory completion, granted when essential safety requirements, including fire safety, are satisfied.

Related: Qualified Person (QP), Building Control Act
Testing and Commissioning (T&C)

Planned verification that installed systems perform to design intent, covering pre-functional checks, functional tests, balancing, controls proving and documented results before handover.

Related: Smoke control system, Variable Air Volume (VAV)
Coefficient of Performance (COP)

For a refrigeration or heat pump machine, the ratio of useful cooling or heating delivered to energy consumed at stated operating conditions; a higher value indicates better efficiency.

Related: kW/RT, Energy Efficiency Ratio (EER)
kW/RT

Chiller plant electrical input in kilowatts divided by cooling delivered in refrigeration tons; a lower value means a more efficient plant and is used in Singapore efficiency benchmarks.

Related: Coefficient of Performance (COP), BCA Green Mark
Energy Efficiency Ratio (EER)

Cooling capacity in British thermal units per hour divided by electrical power input in watts for an air-conditioning unit at rated test conditions; higher values indicate better efficiency.

Related: Coefficient of Performance (COP), kW/RT
BCA Green Mark

Singapore's green building certification scheme run by BCA, scoring energy efficiency, water efficiency, environmental protection, indoor environment and other sustainability outcomes at levels such as Gold and Platinum.

Related: Energy Conservation Act, kW/RT
Air change rate (ACH)

The number of times the air volume of a space is replaced each hour, used to specify ventilation, dilution of contaminants or pressurisation performance.

Related: Smoke control system, Variable Air Volume (VAV)
Variable Air Volume (VAV)

An air-conditioning arrangement that varies supply airflow to each zone while holding supply air temperature nearly constant, reducing fan energy when cooling loads fall.

Related: Air change rate (ACH), Testing and Commissioning (T&C)
Fire damper

A closure fitted in ductwork where it passes through a fire-rated separation, designed to shut automatically on fire to stop smoke and flame travelling through the ventilation system.

Related: Fire Code, Smoke control system
Smoke control system

Engineered measures such as stair pressurisation, smoke exhaust or smoke curtains that keep escape routes and firefighting access usable during a fire.

Related: Fire Code, Fire damper
Heat load calculation

A systematic estimate of sensible and latent heat gains from people, lighting, equipment, solar radiation and conduction, used to size cooling equipment and air distribution.

Related: Psychrometric chart, Variable Air Volume (VAV)
Pump affinity laws

Relationships stating that for a centrifugal pump, flow changes with speed, head with speed squared and power with speed cubed, explaining large energy savings from variable-speed operation.

Psychrometric chart

A graph of moist-air properties such as dry-bulb temperature, humidity ratio and enthalpy, used to analyse cooling, heating, humidification and mixing processes in air-conditioning design.

Related: Heat load calculation, Air change rate (ACH)
Pressure vessel

A closed container designed to hold gas or liquid at pressure above atmospheric, subject to design codes, inspection and WSH requirements to prevent rupture and injury.

Related: Piping and Instrumentation Diagram (P&ID), Preventive maintenance
Piping and Instrumentation Diagram (P&ID)

A schematic showing process equipment, piping, valves, instruments and control loops with identifying tags, used for design, operation, hazard review and management of change.

Related: Pressure vessel, Preventive maintenance
Life cycle cost

The total cost of an asset over its useful life, including capital, energy, maintenance, replacement and disposal, used to compare design options on a whole-life basis.

Related: kW/RT, BCA Green Mark
Refrigerant global warming potential (GWP)

A measure of the climate impact of a refrigerant relative to carbon dioxide over a chosen period, guiding selection of low-impact refrigerants and leak control.

Related: BCA Green Mark, kW/RT
Preventive maintenance

Scheduled inspection, servicing and replacement of equipment performed to reduce failure likelihood and keep performance near design, based on manufacturer guidance and operating history.

Related: Piping and Instrumentation Diagram (P&ID), Pressure vessel