PEB Singapore PPE Mechanical key terms
PEB Singapore PPE Mechanical · Get comfortable with the vocabulary.
- Professional Engineer (PE)
- Related: Qualified Person (QP), Code of Professional Conduct
An engineer registered with Singapore's Professional Engineers Board under the Professional Engineers Act, entitled to take professional responsibility for mechanical engineering works and to submit statutory plans and calculations.
- Qualified Person (QP)
- Related: Professional Engineer (PE), Temporary Occupation Permit (TOP)
A person appointed under the Building Control Act to prepare, submit and supervise building plans and works; mechanical submissions require a QP who is a registered Professional Engineer.
- Code of Professional Conduct
- Related: Professional Engineer (PE), Conflict of interest
Rules under Singapore's Professional Engineers Act setting expected standards of integrity, competence, independence and public safety for registered engineers, breach of which can lead to disciplinary action.
- Conflict of interest
- Related: Code of Professional Conduct
A circumstance where an engineer's financial, personal or other interest could improperly influence professional judgement; it must be disclosed and managed, or the engineer should withdraw from the decision.
- Professional indemnity insurance
- Related: Professional Engineer (PE)
Insurance protecting an engineer or firm against claims for negligence, error or omission in professional services, covering legal defence and compensation up to a stated limit.
- Continuing Professional Development (CPD)
- Related: Professional Engineer (PE)
Structured learning, training and professional activities that registered engineers undertake to keep knowledge and skills current, counted toward renewal of their practising certificate with the Professional Engineers Board.
- Workplace Safety and Health Act (WSH Act)
- Related: Risk assessment, Permit-to-Work (PTW)
Singapore statute imposing duties on employers, occupiers, principals and workers to ensure safety and health at work, supported by regulations on risk management, incident reporting and specific hazards.
- Risk assessment
- Related: Hierarchy of controls, Permit-to-Work (PTW)
A systematic review that identifies hazards, estimates the likelihood and severity of harm, and records controls needed to reduce risk before work starts.
- Hierarchy of controls
- Related: Risk assessment
The preferred order of risk controls: elimination, substitution, engineering controls, administrative controls and finally personal protective equipment; higher levels generally give more reliable protection.
- Permit-to-Work (PTW)
- Related: Lockout-Tagout (LOTO), Risk assessment
A formal written authorisation for high-risk work such as hot work, confined-space entry or work on energised plant, confirming specified precautions are in place before work begins.
- Lockout-Tagout (LOTO)
- Related: Permit-to-Work (PTW)
A procedure that isolates all energy sources and fits locks and warning tags so equipment cannot be restarted during maintenance, preventing injury from unexpected energisation or stored energy.
- Building Control Act
- Related: Qualified Person (QP), Temporary Occupation Permit (TOP)
Singapore law regulating building works, submission and approval of plans, supervision, and permits such as TOP and CSC, administered by the Building and Construction Authority.
- Fire Safety Act
- Related: Fire Code, Fire damper
Singapore law administered by the Singapore Civil Defence Force that requires fire safety measures, fire safety certificates and duties for buildings, supported by the Fire Code.
- Fire Code
- Related: Fire Safety Act, Smoke control system
The Code of Practice for Fire Precautions in Buildings issued by SCDF, prescribing technical requirements for means of escape, smoke control, fire dampers and protection of openings.
- Energy Conservation Act
- Related: BCA Green Mark, kW/RT
Singapore legislation requiring prescribed large energy users and buildings to measure, report and improve energy efficiency, including energy management systems and minimum energy performance standards.
- Security of Payment Act (SOPA)
- Related: Public Sector Standard Conditions of Contract (PSSCOC), Variation Order
The Building and Construction Industry Security of Payment Act gives parties a statutory right to progress payments and fast adjudication, and limits pay-when-paid clauses in construction contracts.
- Public Sector Standard Conditions of Contract (PSSCOC)
- Related: Variation Order, Extension of Time (EOT)
A standard form widely used for Singapore public works, setting out obligations, payment, variations, extension of time and dispute procedures for construction and engineering contracts.
- Variation Order
- Related: Extension of Time (EOT), Public Sector Standard Conditions of Contract (PSSCOC)
A formal instruction that changes the scope, quantity, quality or timing of contracted works, with cost and time effects valued under the contract.
- Extension of Time (EOT)
- Related: Liquidated damages, Variation Order
An extension of the contractual completion date granted for qualifying delays, so the contractor is not liable for liquidated damages for that period.
- Liquidated damages
- Related: Extension of Time (EOT), Public Sector Standard Conditions of Contract (PSSCOC)
A pre-agreed amount payable by the contractor for each day of delay beyond the completion date, representing a genuine estimate of the employer's likely loss.
- Temporary Occupation Permit (TOP)
- Related: Qualified Person (QP), Building Control Act
A permit issued by BCA allowing a completed building to be occupied before statutory completion, granted when essential safety requirements, including fire safety, are satisfied.
- Testing and Commissioning (T&C)
- Related: Smoke control system, Variable Air Volume (VAV)
Planned verification that installed systems perform to design intent, covering pre-functional checks, functional tests, balancing, controls proving and documented results before handover.
- Coefficient of Performance (COP)
- Related: kW/RT, Energy Efficiency Ratio (EER)
For a refrigeration or heat pump machine, the ratio of useful cooling or heating delivered to energy consumed at stated operating conditions; a higher value indicates better efficiency.
- kW/RT
- Related: Coefficient of Performance (COP), BCA Green Mark
Chiller plant electrical input in kilowatts divided by cooling delivered in refrigeration tons; a lower value means a more efficient plant and is used in Singapore efficiency benchmarks.
- Energy Efficiency Ratio (EER)
- Related: Coefficient of Performance (COP), kW/RT
Cooling capacity in British thermal units per hour divided by electrical power input in watts for an air-conditioning unit at rated test conditions; higher values indicate better efficiency.
- BCA Green Mark
- Related: Energy Conservation Act, kW/RT
Singapore's green building certification scheme run by BCA, scoring energy efficiency, water efficiency, environmental protection, indoor environment and other sustainability outcomes at levels such as Gold and Platinum.
- Air change rate (ACH)
- Related: Smoke control system, Variable Air Volume (VAV)
The number of times the air volume of a space is replaced each hour, used to specify ventilation, dilution of contaminants or pressurisation performance.
- Variable Air Volume (VAV)
- Related: Air change rate (ACH), Testing and Commissioning (T&C)
An air-conditioning arrangement that varies supply airflow to each zone while holding supply air temperature nearly constant, reducing fan energy when cooling loads fall.
- Fire damper
- Related: Fire Code, Smoke control system
A closure fitted in ductwork where it passes through a fire-rated separation, designed to shut automatically on fire to stop smoke and flame travelling through the ventilation system.
- Smoke control system
- Related: Fire Code, Fire damper
Engineered measures such as stair pressurisation, smoke exhaust or smoke curtains that keep escape routes and firefighting access usable during a fire.
- Heat load calculation
- Related: Psychrometric chart, Variable Air Volume (VAV)
A systematic estimate of sensible and latent heat gains from people, lighting, equipment, solar radiation and conduction, used to size cooling equipment and air distribution.
- Pump affinity laws
Relationships stating that for a centrifugal pump, flow changes with speed, head with speed squared and power with speed cubed, explaining large energy savings from variable-speed operation.
- Psychrometric chart
- Related: Heat load calculation, Air change rate (ACH)
A graph of moist-air properties such as dry-bulb temperature, humidity ratio and enthalpy, used to analyse cooling, heating, humidification and mixing processes in air-conditioning design.
- Pressure vessel
- Related: Piping and Instrumentation Diagram (P&ID), Preventive maintenance
A closed container designed to hold gas or liquid at pressure above atmospheric, subject to design codes, inspection and WSH requirements to prevent rupture and injury.
- Piping and Instrumentation Diagram (P&ID)
- Related: Pressure vessel, Preventive maintenance
A schematic showing process equipment, piping, valves, instruments and control loops with identifying tags, used for design, operation, hazard review and management of change.
- Life cycle cost
- Related: kW/RT, BCA Green Mark
The total cost of an asset over its useful life, including capital, energy, maintenance, replacement and disposal, used to compare design options on a whole-life basis.
- Refrigerant global warming potential (GWP)
- Related: BCA Green Mark, kW/RT
A measure of the climate impact of a refrigerant relative to carbon dioxide over a chosen period, guiding selection of low-impact refrigerants and leak control.
- Preventive maintenance
- Related: Piping and Instrumentation Diagram (P&ID), Pressure vessel
Scheduled inspection, servicing and replacement of equipment performed to reduce failure likelihood and keep performance near design, based on manufacturer guidance and operating history.