PEB Singapore PPE Mechanical study materials
PEB Singapore PPE Mechanical study resources

PEB Singapore PPE Mechanical cheat sheet

PEB Singapore PPE Mechanical · Keep the key ideas within reach.

Quick reference

Mechanical Engineering Design and Analysis

  • Bending stress σ = My/I = M/Z, with section modulus Z = I/c; maximum stress occurs at the extreme fibre.

  • Transverse shear stress in a beam section τ = VQ/(It); for a rectangular section the peak is 1.5 × the average shear stress V/A.

  • Torsion of a circular shaft: τ = Tr/J; for a hollow shaft J = π(do⁴ − di⁴)/32.

  • Thin-walled cylinder under internal pressure p: hoop stress σ = pr/t, longitudinal stress σ = pr/2t; a thin sphere has σ = pr/2t throughout.

  • Euler buckling load Pcr = π²EI/(KL)², with K = 0.5 fixed-fixed, 0.7 fixed-pinned, 1.0 pinned-pinned, 2.0 cantilever.

  • Modified Goodman line for fatigue: σa/Se + σm/Sut = 1; the Soderberg line replaces Sut with Sy and is more conservative.

  • Endurance limit Se = ka·kb·kc·kd·ke·Se′, with Se′ ≈ 0.5·Sut for steels up to about Sut = 1400 MPa.

  • Notch sensitivity q = (Kf − 1)/(Kt − 1), so the fatigue stress-concentration factor Kf = 1 + q(Kt − 1).

  • Fully restrained thermal stress σ = E·α·ΔT; a simply supported beam with a central point load deflects δ = PL³/(48EI).

Quick reference

Building Services and HVAC Systems

  • Affinity laws at constant impeller diameter and air density: flow ∝ N, pressure/head ∝ N², shaft power ∝ N³.

  • Chiller COP = cooling output ÷ electrical input; since 1 refrigeration ton = 3.517 kW, kW/RT = 3.517/COP.

  • Sensible heat of an air stream Qs (W) ≈ 1.21 × volume flow (L/s) × ΔT (K), from ρ = 1.2 kg/m³ and cp = 1.005 kJ/kg·K.

  • Air changes per hour ACH = 3600 × volumetric flow (m³/s) ÷ room volume (m³).

  • Duct velocity pressure Pv = 0.6·v² (Pa with v in m/s); total pressure equals static plus velocity pressure.

  • Darcy–Weisbach friction loss Δp = f(L/D)(ρv²/2); equivalent circular diameter of a rectangular duct De = 1.30(ab)^0.625/(a + b)^0.25.

  • Moist-air enthalpy h = 1.006T + W(2501 + 1.86T) kJ/kg dry air, with T in °C and humidity ratio W in kg/kg.

  • Coil bypass factor = (h_off − h_ADP)/(h_in − h_ADP); a lower bypass factor indicates a deeper or more effective cooling coil.

  • Singapore practice: SS 553 governs ACMV design, SS 530 sets equipment efficiency standards, and design setpoints are typically 24–26 °C with RH ≤ 65%.

Quick reference

Plant, Manufacturing and Process Equipment

  • ASME VIII Div 1 circumferential-stress shell equation: t = PR/(SE − 0.6P), with E the joint efficiency and S the allowable stress.

  • Hydrostatic test pressure = 1.3 × MAWP × (allowable stress at test temperature / allowable stress at design temperature).

  • LMTD = (ΔT1 − ΔT2)/ln(ΔT1/ΔT2); apply a correction factor F < 1 for multipass and cross-flow exchangers.

  • Pump shaft power P(kW) = ρgQH/(1000·η), with Q in m³/s, H in m and ρ in kg/m³.

  • NPSHa = (Pa − Pv)/(ρg) + Hs − Hf; cavitation occurs when NPSHa falls below the pump's NPSHr.

  • Pressure relief valves are sized to API 520/521; set pressure must not exceed MAWP and the valve must pass the governing relieving case.

  • ASME B31.3 governs process piping; minimum design metal temperature and impact-testing requirements control low-temperature service.

  • Corrosion allowance is added to the calculated minimum thickness for the life of the equipment and is not counted as load-bearing strength.

Quick reference

Project Management and Construction Practice

  • Total float = LS − ES = LF − EF; activities with zero total float lie on the critical path.

  • PERT expected duration te = (O + 4M + P)/6 and activity standard deviation σ = (P − O)/6.

  • Earned value: CV = EV − AC, SV = EV − PV, CPI = EV/AC, SPI = EV/PV; forecast EAC = BAC/CPI when current performance persists.

  • A WBS decomposes work into deliverable-based work packages that can be costed, scheduled and assigned to a single responsible party.

  • Quality assurance is process-based and preventive; quality control is inspection and testing of the finished output.

  • Extension of time is due for employer-risk and neutral events, not contractor-default delay; concurrent delay generally preserves time but can bar prolongation cost.

  • Typical Singapore retention is 10% deducted from each payment, capped at 5% of the contract sum, with half released at practical completion.

  • Resource levelling shifts work within float and cannot shorten the project; crashing shortens duration by adding cost to critical-path activities.

Quick reference

Engineering Ethics and Professional Conduct

  • The duty to public safety, health and welfare is paramount and overrides loyalty to a client or employer.

  • Sign and seal only drawings and reports you personally prepared or directly supervised; splitting scope to evade this is professional misconduct.

  • Declare any financial or personal interest in tenderers, suppliers or competitors and decline the appointment if the conflict cannot be managed.

  • Accept only work within your current competence; where a task exceeds it, engage a qualified specialist and remain accountable for coordination.

  • Undisclosed commissions, gifts or hospitality capable of influencing technical judgement are prohibited under the Prevention of Corruption Act.

  • Client confidentiality survives the end of the engagement, except where disclosure is required by law or necessary to protect safety.

  • Advertising and fee proposals must not be misleading; contingency fees on safety-critical certification are improper.

  • Report unsafe or non-compliant work to the employer first, then escalate to the Professional Engineers Board, BCA or MOM if unresolved.

Quick reference

Law, Contracts and Regulatory Compliance

  • The Professional Engineers Act requires registration with the PEB and a valid practising certificate to supply professional engineering services in Singapore.

  • The Building Control Act requires plans and structural or applied-system works to be signed by an appropriate qualified person and submitted to the Commissioner of Building Control.

  • The WSH Act imposes duties on every employer, self-employed person, principal and occupier to ensure safety so far as is reasonably practicable.

  • The Security of Payment Act creates a statutory right to progress payments and rapid adjudication; 'pay when paid' provisions are void.

  • Public sector projects use the PSSCOC; private sector projects commonly use the PAM or SIA forms of contract.

  • Liquidated damages must be a genuine pre-estimate of the employer's loss; a clause that is a penalty in disguise is unenforceable.

  • In design-and-build procurement the contractor carries design risk, so the employer's requirements must be stated as clear performance criteria.

  • Contractual time bars extinguish claims if notice is not served within the stated period; the exact period must be read from the contract conditions.

Quick reference

Safety, Health, Environment and Risk Management

  • Hierarchy of controls, applied top-down: elimination, substitution, engineering controls, administrative controls, then PPE.

  • Risk = likelihood × severity; residual risk after controls must be reduced to ALARP before work proceeds.

  • The WSH (Risk Management) Regulations require every workplace to conduct, record and periodically review risk assessments.

  • Noise exposure limit is 85 dB(A) over 8 hours; hearing protection and a hearing conservation programme apply at or above that level.

  • Confined space entry needs a permit, gas testing for oxygen, flammables and H2S, continuous ventilation, a standby man and rescue arrangements.

  • A permit-to-work combined with lock-out/tag-out is required to isolate stored energy before maintenance on plant and machinery.

  • FMEA ranks risk by RPN = severity × occurrence × detection; HAZOP applies guide words to nodes of a P&ID to find deviations.

  • ISO 45001 addresses occupational health and safety management; ISO 14001 addresses environmental management systems.

Quick reference

Energy Efficiency, Sustainability and Engineering Economics

  • NPV = Σ Ct/(1 + r)^t − C0; accept a project where NPV > 0 at the required discount rate.

  • IRR is the discount rate at which NPV = 0 and is compared against the organisation's hurdle rate.

  • Simple payback = capital cost ÷ annual net savings; it ignores the time value of money and all cash flows after payback.

  • Life-cycle cost covers capital, energy, maintenance, replacement and disposal, and energy typically dominates chiller economics over 15–20 years.

  • BCA Green Mark ratings run Certified, Gold, GoldPLUS, Platinum, Super Low Energy and Zero Energy, scoring energy, water and environmental performance.

  • Singapore's grid emission factor is about 0.42 kg CO2e per kWh, so each kWh saved avoids roughly 0.4 kg CO2e.

  • Chiller plant efficiency: about 0.65 kW/RT is good practice and 0.5 kW/RT or lower is best in class.

  • Variable-speed drives capture cube-law savings at part load; savings are quantified through measurement and verification such as IPMVP.

  • SS 530 sets minimum energy performance standards for air-conditioners and chillers regulated for sale in Singapore.