CA C-20 HVAC case studies
CA C-20 HVAC · Put your knowledge to work in context.
The CSLB C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor license is the California credential that allows a business to contract for the installation, alteration, and repair of warm-air heating, ventilating, air-conditioning, and refrigeration systems. It is aimed at working technicians and installers who are ready to move into ownership or qualifier roles, and at existing businesses adding a specialty. Licensing requires passing a trade examination plus a separate Law and Business examination; the CSLB publishes the current item counts, time allowances, fees, and passing standard in its candidate information bulletin, so check cslb.ca.gov for the numbers in force on your test date. The trade exam is closed book and computer based, and it is weighted toward practical field judgment rather than memorized trivia: load and layout planning, duct design and fabrication, the refrigeration cycle and its components, heating equipment and heat pumps, motors and controls, piping and refrigerant handling, evacuation and charging, troubleshooting, and jobsite safety and code compliance. The CA C-20 HVAC case studies are 5 cases and about 4,697 words.
1Sizing the Duct System and Return Path for a 5-Ton Office TI
A 2,200 ft² open-office tenant improvement gets one new 5-ton (60,000 Btu/h) packaged RTU rated 2,000 cfm at 0.90 in. Manual J: 52,000 Btu/h total, 38,000 Btu/h sensible at 95°F outdoor, 75°F / 50% RH indoor.
972 words, about 5 min2Fabrication and Layout Conflicts on a 3,000 cfm Trunk
A shop is fabricating a 60 ft supply trunk for a 3,000 cfm low-velocity commercial system. The drawing shows 24 x 12 in.
955 words, about 5 min3Superheat, Subcooling, and the "Topped Off" System
A 3-ton R-410A residential split with a TXV has been running all afternoon. Outdoor 95°F, indoor 80°F DB / 67°F WB.
906 words, about 5 min4Overload Trips on a 208 V Three-Phase Compressor
A 5-ton packaged unit with a 208 V three-phase scroll compressor (RLA 18.0 A, LRA 110 A) trips its internal overload after about 20 minutes of running on a 100°F day. Line voltage measured at the disconnect while the unit is running: L1-L2 = 210 V, L2-L3 = 205 V, L1-L3 = 196 V.
837 words, about 4 min5Evacuation, Weigh-In Charging, and Final Trim on a New R-410A Split
A new 3-ton R-410A split system is being commissioned. The line set is 3/4 in.
1,027 words, about 5 min